Suspension of all operating licenses.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1979.
|
| Series: | Generic letter ;
79-64. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo153519 |
Similar Items
New procedures for providing public notice concerning issuance of amendments to operating licenses.
Published: (1983)
Published: (1983)
BEPU analysis and benchmark with IIST 2% SBLOCA experiment using TRACE/DAKOTA /
by: Shih, Chunkuan
Published: (2015)
by: Shih, Chunkuan
Published: (2015)
Long term low power operation in pressurized water reactors.
Published: (1984)
Published: (1984)
Level instrumentation inaccuracies observed during normal plant depressurization.
Published: (1993)
Published: (1993)
Post-test analysis of ROSA-2 test 2 (IBLOCA) with TRACE /
by: Gallardo, S.
Published: (2019)
by: Gallardo, S.
Published: (2019)
Safety evaluation of Westinghouse topical reports dealing with elimination of postulated pipe breaks in PWR primary main loops.
Published: (1984)
Published: (1984)
Consolidated guidance about materials licenses : guidance about admiistrative licensing procedures: draft report for comment /
by: Browder, Rachel
Published: (2018)
by: Browder, Rachel
Published: (2018)
Safety evaluation report related to the license renewal of Sequoyah Nuclear Plant Units 1 and 2 : Docket numbers 50-327 and 50-328.
Published: (2015)
Published: (2015)
Safety evaluation report related to the license renewal of Sequoyah Nuclear Plant Units 1 and 2 : Docket numbers 50-327 and 50-328.
Published: (2015)
Published: (2015)
An approach for estimating the frequencies of various containment failure modes and bypass events : final report /
Published: (2004)
Published: (2004)
An approach for estimating the frequencies of various containment failure modes and bypass events : draft report for comment /
by: Pratt, W. T. (William T.)
Published: (2003)
by: Pratt, W. T. (William T.)
Published: (2003)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Safety evaluation report related to the license renewal of Grand Gulf Nuclear Station, unit 1 : Docket number 50-416, Entergy Operations, Inc.
Published: (2016)
Published: (2016)
Analysis of severe accidents in pressurized heavy-water reactors.
Published: (2008)
Published: (2008)
Simulation of LSTF hot leg break (OECD/NEA ROSA-2 test 1) with TRACE code : application to a PWR NPP model /
by: Gonzalez-Cadelo, Juan
Published: (2014)
by: Gonzalez-Cadelo, Juan
Published: (2014)
Simulation of LSTF upper head break (OECD/NEA ROSA test 6.1) with TRACE code : application to a PWR NPP model /
by: Queral, César
Published: (2014)
by: Queral, César
Published: (2014)
Accident analysis for nuclear power plants with pressurized water reactors /
Published: (2003)
Published: (2003)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Unit startup with degraded high pressure safety injection system.
Published: (1986)
Published: (1986)
Inadvertent boron dilution events.
Published: (1985)
Published: (1985)
Undetected modification of flow characteristics in the high pressure safety Injection system.
Published: (1993)
Published: (1993)
Contaminants and stagnant conditions affecting stress corrosion cracking in stainless steel piping in pressurized water reactors.
Published: (2011)
Published: (2011)
CFD analysis of full-scale steam generator inlet plenum mixing during a PWR severe accident /
by: Boyd, Christopher Fred, et al.
Published: (2004)
by: Boyd, Christopher Fred, et al.
Published: (2004)
CFD analysis of 1/7th scale steam generator inlet plenum mixing during a PWR severe accident /
by: Boyd, Christopher Fred, et al.
Published: (2003)
by: Boyd, Christopher Fred, et al.
Published: (2003)
Advanced reactor licensing : experience with digital I&C technology in evolutionary plants /
Published: (2004)
Published: (2004)
Shippingport operations : from start-up to first refueling, December 18, 1957 to October 7, 1959 /
Published: (1960)
Published: (1960)
Conduct of regulatory review and assessment during the licensing process for nuclear power plants : a safety guide.
Published: (1980)
Published: (1980)
Knowledge and abilities catalog for nuclear power plant operators : pressurized water reactors, Westinghouse AP1000: draft report for comment /
by: Kellum, J., et al.
Published: (2011)
by: Kellum, J., et al.
Published: (2011)
Application of TRACE V5.0 P2 to China domestic PWR LBLOCA analysis /
by: Jinjun, Feng
Published: (2013)
by: Jinjun, Feng
Published: (2013)
Regulatory guide 1.190 : calculational and dosimetry methods for determining pressure vessel neutron fluence.
Published: (2001)
Published: (2001)
SCDAP/RELAP5 thermal-hydraulic evaluations of the potential for containment bypass during extended station blackout severe accident sequences in a Westinghouse four-loop PWR /
Published: (2010)
Published: (2010)
Main steam isolation valve closure logic.
Published: (1985)
Published: (1985)
Sensitivity analyses of a hypothetical 6 inch break, LOCA in Ascó NPP using RELAP/MOD3.2 /
Published: (2010)
Published: (2010)
Stress corrosion cracking in PWR steam generator tubes.
Published: (1990)
Published: (1990)
Degradation or loss of charging systems at PWR nuclear power plants using swing-pump designs.
Published: (1986)
Published: (1986)
Steam generator tube ruptures at two PWR facilities.
Published: (1979)
Published: (1979)
Referencing 6/29/79 letter re multiple equipment failures.
Published: (1979)
Published: (1979)
Overexposures in PWR cavities.
Published: (1982)
Published: (1982)
TRACE/RELAP5 comparative calculations for double-ended LBLOCA and SBO /
by: Legan, S.
Published: (2016)
by: Legan, S.
Published: (2016)
Two events involving unauthorized entries into PWR reactor cavities.
Published: (1984)
Published: (1984)