Containment purging and venting during normal operation.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
[1979]
|
| Series: | Generic letter ;
79-54. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo153511 |
Similar Items
Containment purging and venting during normal operation--guidelines for valve operability.
Published: (1979)
Published: (1979)
Direction-dependent leak characteristics of containment purge valves.
Published: (1988)
Published: (1988)
Breach of containment integrity.
Published: (1979)
Published: (1979)
Primary containment isolation valve discrepancies.
Published: (1983)
Published: (1983)
Inadvertent containment spray due to personnel error.
Published: (1981)
Published: (1981)
Excessive nitrogen supply pressure actuates safety-relief valve operation to cause reactor depressurization.
Published: (1980)
Published: (1980)
Failure of swing check valve in the decay heat removal system at Davis-Besse Unit No. 1.
Published: (1980)
Published: (1980)
Susceptibility of containment sump recirculation gate valves to pressure locking.
Published: (1995)
Published: (1995)
Failures of scram discharge volume vent and drain valves.
Published: (1986)
Published: (1986)
Uncontrolled leakage of reactor coolant outside containment.
Published: (1985)
Published: (1985)
Degradation of containment isolation capability by a high-energy line break.
Published: (1989)
Published: (1989)
Failure of elastomer seated butterfly valves used only during cold shutdowns.
Published: (1984)
Published: (1984)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
Failure to close service water cross-connect isolation valves.
Published: (1989)
Published: (1989)
Suceptibility of low-pressure coolant injection and core spray injection valves to pressure locking.
Published: (1995)
Published: (1995)
Reduction of reactor coolant inventory because of misalignment of RHR valves.
Published: (1986)
Published: (1986)
Thermally induced pressure locking of a high pressure coolant injection valve.
Published: (1996)
Published: (1996)
Loss of shutdown cooling during disassembly of high pressure safety injection system check valve.
Published: (1991)
Published: (1991)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
RCIC and HPCI turbine exhaust check valve failures.
Published: (1982)
Published: (1982)
LWR primary coolant system pressure isolation valves.
Published: (1980)
Published: (1980)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Unit startup with degraded high pressure safety injection system.
Published: (1986)
Published: (1986)
Undetected modification of flow characteristics in the high pressure safety Injection system.
Published: (1993)
Published: (1993)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Dependency of offset disc butterfly valve's operation on orientation with respect to flow.
Published: (1991)
Published: (1991)
Maintenance deficiency associated with solenoid-operated valves.
Published: (1990)
Published: (1990)
Availability of NUREG-1169, "Technical findings related to Generic Issue C-8; boiling water reactor main steam isolation valve leakage and leakage treatment methods".
Published: (1986)
Published: (1986)
Horizontally-installed motor-operated gate valves.
Published: (1992)
Published: (1992)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Motor-operated valve failures due to hammering effect.
Published: (1985)
Published: (1985)
Effects of changing valve motor-operator switch settings.
Published: (1986)
Published: (1986)
Air actuator and supply air regulator problems in Copes-Vulcan pressurizer power-operated reliel valves.
Published: (1995)
Published: (1995)
Leaking shutdown cooling isolation valves at Cooper Nuclear Station.
Published: (1994)
Published: (1994)
Failures of motor-operated valves due to degraded stem lubricant.
Published: (2010)
Published: (2010)
Motor-operated valve inoperable due to stem-disc separation.
Published: (2012)
Published: (2012)
Motor-operated valve failure caused by stem protector pipe interference.
Published: (1995)
Published: (1995)
Main steam isolation valve closure logic.
Published: (1985)
Published: (1985)