Potential unreviewed safety question on interaction between non-safety grade systems and safety grade systems.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1979.
|
| Series: | Generic letter ;
79-42. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo153499 |
Similar Items
Scheduling guidance for licensee submittals of reloads that involve unreviewed safety questions.
Published: (1984)
Published: (1984)
Summary of meetings held on 9/18-20/79 to discuss potential unreviewed safety question on systems interaction for B&W Pl.
Published: (1979)
Published: (1979)
Apparently improper use of commercial grade components in safety-related systems.
Published: (1983)
Published: (1983)
Safety systems reliability /
by: Green, A. E. (Arthur Eric)
Published: (1983)
by: Green, A. E. (Arthur Eric)
Published: (1983)
Impact of non-safety related electrical support system vulnerabilities on safety systems.
Published: (2008)
Published: (2008)
Isolation between signals of the protection system and non-safety-related equipment.
Published: (1984)
Published: (1984)
Recent issues related to the qualification and commercial grade dedication of safety-related components.
Published: (2014)
Published: (2014)
Inadequate dedication process for commercial-grade components which could lead to common mode failure of a safety system.
Published: (1989)
Published: (1989)
Inadequate or poorly-controlled, non-safety-related maintenance activities unnecessarily challenged safety systems.
Published: (1998)
Published: (1998)
Potential inconsistency between plant safety analyses and technical specifications.
Published: (1986)
Published: (1986)
Manual on maintenance of systems and components important to safety.
Published: (1986)
Published: (1986)
The interface between safety and security at nuclear power plants /
Published: (2010)
Published: (2010)
Nuclear power safety /
Published: (1976)
Published: (1976)
Commercial-grade structural framing components supplied as nuclear safety-related equipment.
Published: (1991)
Published: (1991)
Inadequate control of temporary modifications to safety-related systems.
Published: (1989)
Published: (1989)
Safety of nuclear power plants : design.
Published: (2012)
Published: (2012)
The role of probabilistic safety assessment and probabilistic safety criteria in nuclear power plant safety /
Published: (1992)
Published: (1992)
Potential for loss of automatic engineered safety feature actuation.
Published: (1995)
Published: (1995)
Nuclear safety /
by: Petrangeli, Gianni
Published: (2006)
by: Petrangeli, Gianni
Published: (2006)
Resolution of unresolved safety issue A-17, "Systems interactions in nuclear power plants".
Published: (1989)
Published: (1989)
Atomic power safety /
by: Hogerton, John F.
Published: (1964)
by: Hogerton, John F.
Published: (1964)
Nuclear power plant instrumentation and control systems for safety and security /
by: Yastrebenetsky, Michael, 1934-
Published: (2014)
by: Yastrebenetsky, Michael, 1934-
Published: (2014)
Instrument air supply system problems affecting safety-related equipment.
Published: (1988)
Published: (1988)
Failures of air-operated valves affecting safety-related systems.
Published: (1988)
Published: (1988)
Single failure vulnerability of engineered safety features activation systems.
Published: (1993)
Published: (1993)
Examples of safety culture practices.
Published: (1997)
Published: (1997)
Safety of nuclear power plants: Design : Requirements /
Published: (2000)
Published: (2000)
Human factors in nuclear safety /
Published: (1996)
Published: (1996)
Nuclear power and safety.
Published: (1979)
Published: (1979)
Inadequate testing of engineered safety features actuation systems.
Published: (1993)
Published: (1993)
Use of probabilistic safety assessment for operational safety : PSA '91 : proceedings of an International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety /
Published: (1992)
Published: (1992)
The safety of nuclear power : a report /
Published: (1992)
Published: (1992)
Flow blockage of cooling water to safety system components.
Published: (1988)
Published: (1988)
Bypassed and inoperable status indication for nuclear power plant safety systems.
Published: (2010)
Published: (2010)
Potential problems caused by single failure of an engineered safety feature swing bus.
Published: (1988)
Published: (1988)
Nuclear safety infrastructure for a national nuclear power programme supported by the IAEA Fundamental Safety Principles /
Published: (2008)
Published: (2008)