Mark II generic acceptance criteria for lead plants.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1978.
|
| Series: | Generic letter ;
78-41. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo152989 |
Similar Items
Transmittal of NUREG-0763, "Guidelines for confirmatory in-plant tests of safety-relief valve discharges for BWR plants," and NUREG-0783, "Suppression pool temperature limits for BWR containments".
Published: (1982)
Published: (1982)
Design, instrumentation, and testing of a steel containment vessel model /
by: Luk, V. K.
Published: (2000)
by: Luk, V. K.
Published: (2000)
BWR off-gas systems--enclosing NUREG/CR-0727.
Published: (1979)
Published: (1979)
Issuance of NUREG-0313, rev 1, "Technical report on material selection and processing guidelines for BWR coolant pressure".
Published: (1980)
Published: (1980)
Modifications to boiling water reactor control rod drive systems.
Published: (1980)
Published: (1980)
BWR control rod failures.
Published: (1980)
Published: (1980)
IEB 80-07 BWR jet pump assembly failure.
Published: (1980)
Published: (1980)
Forwarding of 2 tables of appendix I, draft radiological effluent technical specifications, BWR, and NUREG-0133.
Published: (1978)
Published: (1978)
Model appendix I technical specifications and submittal schedule for BWRs.
Published: (1978)
Published: (1978)
Forwarding pages omitted from 07/11/78 letter.
Published: (1978)
Published: (1978)
Vacuum relief system for boiling water reactor Mark I and Mark II containments.
Published: (1985)
Published: (1985)
IEB 80-17 supplement 1 failure of control rods to insert during a scram at a BWR.
Published: (1980)
Published: (1980)
Suppression pool temperature limits for BWR containments : generic technical activity A-39 /
by: Su, T. M.
Published: (1981)
by: Su, T. M.
Published: (1981)
NRC staff review of responses to I&E Bulletin 79-08.
Published: (1979)
Published: (1979)
Torus shells with corrosion and degraded coatings in BWR containments.
Published: (1988)
Published: (1988)
Drywell debris transport study : final report.
Published: (1999)
Published: (1999)
Acceptance criteria for the Mark I containment long term program.
Published: (1979)
Published: (1979)
Safety/relief valve quencher loads : evaluation for BWR Mark II and III containments.
Published: (1982)
Published: (1982)
Investigation of distorted-geometry simulation of pool dynamics in horizontal-vent BWR containments /
by: Ruggieri, N. G., et al.
Published: (1980)
by: Ruggieri, N. G., et al.
Published: (1980)
Noble gas recovery study, maritime nuclear ship Savannah : final report /
Published: (1965)
Published: (1965)
Resolution of generic issue 101 "Boiling water reactor water level redundancy".
Published: (1989)
Published: (1989)
Technical resolution of Generic Issue No. B-59-(N-1) loop operation in BWRs and PWRs.
Published: (1986)
Published: (1986)
Technical basis for the containment protection and release reduction rulemaking for boiling water reactors with Mark I and Mark II containments /
by: Barr, Jonathan
Published: (2018)
by: Barr, Jonathan
Published: (2018)
Generic activity A-10.
Published: (1980)
Published: (1980)
Generic activity A-10 BWR cracks.
Published: (1980)
Published: (1980)
Wet-steam turbines for nuclear power plants /
by: Leĭzerovich, A. Sh. (Aleksandr Shaulovich)
Published: (2005)
by: Leĭzerovich, A. Sh. (Aleksandr Shaulovich)
Published: (2005)
Implementation of NUREG-0313, technical report on material selection & processing GL for BWR coolant press boundary piping.
Published: (1981)
Published: (1981)
Assessment and management of ageing of major nuclear power plant components important to safety : BWR pressure vessels.
Published: (2005)
Published: (2005)
Containment concrete surface condition examination frequency and acceptance criteria.
Published: (2010)
Published: (2010)
An experimental and modelling study of natural-circulation boiling water reactor dynamics /
by: Zboray, Robert
Published: (2002)
by: Zboray, Robert
Published: (2002)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1985)
Published: (1985)
Operability testing of relief and safety relief valves.
Published: (1979)
Published: (1979)
Torus cracking in a BWR mark 1 containment.
Published: (2006)
Published: (2006)
Technical resolution of Generic Issue B-19-thermal hydraulic stability.
Published: (1985)
Published: (1985)
Advanced nuclear reactor : technology overview and current issues /
by: Arostegui, Danielle A., et al.
Published: (2018)
by: Arostegui, Danielle A., et al.
Published: (2018)
IEB 80-17 supplement 4, failure of control rods to insert during a scram at a BWR.
Published: (1980)
Published: (1980)
Operational issues identified in boiling water reactor trip and transient.
Published: (2000)
Published: (2000)