Forwarding of 2 tables of appendix I, draft radiological effluent technical specifications, BWR, and NUREG-0133.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1978.
|
| Series: | Generic letter ;
78-39. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo152987 |
Similar Items
Forwarding of 2 tables of appendix I, draft radiological effluent technical specifications, PWR, and NUREG-0133.
Published: (1978)
Published: (1978)
Transmitting NUREG-0473, revision 2, draft radiological effluent technical specifications.
Published: (1979)
Published: (1979)
BWR off-gas systems--enclosing NUREG/CR-0727.
Published: (1979)
Published: (1979)
Issuance of NUREG-0313, rev 1, "Technical report on material selection and processing guidelines for BWR coolant pressure".
Published: (1980)
Published: (1980)
Transmittal of NUREG-0763, "Guidelines for confirmatory in-plant tests of safety-relief valve discharges for BWR plants," and NUREG-0783, "Suppression pool temperature limits for BWR containments".
Published: (1982)
Published: (1982)
BWR control rod failures.
Published: (1980)
Published: (1980)
NUREG-0737 technical specifications.
Published: (1983)
Published: (1983)
NUREG-0737 technical specifications.
Published: (1983)
Published: (1983)
Implementation of NUREG-0313, technical report on material selection & processing GL for BWR coolant press boundary piping.
Published: (1981)
Published: (1981)
Model appendix I technical specifications and submittal schedule for BWRs.
Published: (1978)
Published: (1978)
IEB 80-07 BWR jet pump assembly failure.
Published: (1980)
Published: (1980)
BWR feedwater nozzle and control rod drive return line nozzle cracking (NUREG-0619).
Published: (1981)
Published: (1981)
Forwarding pages omitted from 07/11/78 letter.
Published: (1978)
Published: (1978)
BWR scram discharge system.
Published: (1980)
Published: (1980)
BWR scram discharge system.
Published: (1981)
Published: (1981)
BWR scram system.
Published: (1980)
Published: (1980)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1985)
Published: (1985)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Partial plugging of suppression pool strainers at a foreign BWR.
Published: (1992)
Published: (1992)
BWR post-scram drywell pressurization.
Published: (1984)
Published: (1984)
The establishment and assessment of Kuosheng (BWR/6) NPP dry-storage system TRACE/SNAP model /
by: Shih, Chunkuan
Published: (2015)
by: Shih, Chunkuan
Published: (2015)
Modifications to boiling water reactor control rod drive systems.
Published: (1980)
Published: (1980)
Mark II generic acceptance criteria for lead plants.
Published: (1978)
Published: (1978)
Generic activity A-10 BWR cracks.
Published: (1980)
Published: (1980)
BWR high-pressure coolant injection (HPCI) initiation seal-in and indication.
Published: (1984)
Published: (1984)
Potential problems with BWR level instrumentation backfill modifications.
Published: (1993)
Published: (1993)
Torus cracking in a BWR mark 1 containment.
Published: (2006)
Published: (2006)
Thermal stratification of water in BWR reactor vessels.
Published: (1993)
Published: (1993)
Offsite dose calculation manual guidance : standard radiological effluent controls for boiling water reactors, generic letter 89-01, supplement no.1 /
by: Meinke, W. Wayne, et al.
Published: (1991)
by: Meinke, W. Wayne, et al.
Published: (1991)
BWR operation with indicated flow less than natural circulation.
Published: (1996)
Published: (1996)
Standard technical specifications, General Electric BWR/6 plants.
Published: (2012)
Published: (2012)
Standard technical specifications, General Electric BWR/4 plants.
Published: (2012)
Published: (2012)
Design vulnerability in BWR reactor vessel level instrumentation backfill modification.
Published: (2002)
Published: (2002)
Torus shells with corrosion and degraded coatings in BWR containments.
Published: (1988)
Published: (1988)
Hydrogen combustion events in foreign BWR piping.
Published: (2002)
Published: (2002)
The development and application of Kuosheng (BWR/6) nuclear power plant TRACE/SNAP model /
by: Shih, Chunkuan
Published: (2014)
by: Shih, Chunkuan
Published: (2014)
Suppression pool temperature limits for BWR containments : generic technical activity A-39 /
by: Su, T. M.
Published: (1981)
by: Su, T. M.
Published: (1981)
IEB 80-17 supplement 4, failure of control rods to insert during a scram at a BWR.
Published: (1980)
Published: (1980)