Failure of main feedwater check valves causes loss of feedwater system integrity and water-hammer damage.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1986.
|
| Series: | Information notice ;
86-02. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo147903 |
Similar Items
Failure of main feedwater check valves causes loss of feedwater system integrity and water-hammer damage.
Published: (1986)
Published: (1986)
Failure of auxiliary feedwater manual isolation valve.
Published: (1986)
Published: (1986)
Water hammer and possible piping damage caused by misapplication of Kerotest packless metal diaphragm globe valves.
Published: (1988)
Published: (1988)
Single failures in auxiliary feedwater systems.
Published: (1987)
Published: (1987)
Disablement of turbine-driven auxiliary feedwater pump due to closure of one of the parallel steam supply valves.
Published: (1989)
Published: (1989)
Loss of feedwater isokinetic sampling probes at Dresden units 2 and 3.
Published: (2004)
Published: (2004)
Water hammer : practical solutions /
by: Sharp, B. B.
Published: (1996)
by: Sharp, B. B.
Published: (1996)
Steam generator feedwater distribution piping damage.
Published: (1991)
Published: (1991)
General water-hammer analysis for simple pipe lines /
by: Wood, F. M.
Published: (1969)
by: Wood, F. M.
Published: (1969)
Cracking In feedwater lines.
Published: (1979)
Published: (1979)
Water hammer in pipe-line systems /
by: Záruba, Josef
Published: (1993)
by: Záruba, Josef
Published: (1993)
Stem binding in turbine governor valves in reactor core isolation cooling (RCIC) and auxiliary feedwater (AFW) systems.
Published: (1998)
Published: (1998)
Feedwater line break.
Published: (1986)
Published: (1986)
Cracking In feedwater system piping.
Published: (1991)
Published: (1991)
Significant unexpected erosion of feedwater lines.
Published: (1987)
Published: (1987)
Thermal stratification in feedwater system piping.
Published: (1991)
Published: (1991)
Check valve failures.
Published: (1981)
Published: (1981)
Inoperability of auxiliary and emergency feedwater auto-start circuits on loss of main feedwater pumps.
Published: (2015)
Published: (2015)
Auxiliary feedwater sparger and pipe hanger damage.
Published: (1984)
Published: (1984)
Distribution valves : selection, installation, field testing, and maintenance.
Published: (2006)
Published: (2006)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
Complete loss of main and auxiliary feedwater at a PWR designed by Babcock & Wilcox.
Published: (1985)
Published: (1985)
Failures of main steam isolation check valves resulting in disc separation.
Published: (1990)
Published: (1990)
Motor-operated valve failures due to hammering effect.
Published: (1985)
Published: (1985)
Failures of nut-locking devices in check-valves.
Published: (1993)
Published: (1993)
Failure of air check valves to seat.
Published: (1985)
Published: (1985)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Overspeed of the turbine-driven auxiliary feedwater pumps and overpressurization of the associated piping systems.
Published: (1990)
Published: (1990)
Common mode failure of main steam isolation nonreturn check valves.
Published: (1983)
Published: (1983)
Loss of suction to emergency feedwater pumps.
Published: (1980)
Published: (1980)
Water hammer : its cause, magnitude, prevention.
by: Goldman, Oscar G.
Published: (1953)
by: Goldman, Oscar G.
Published: (1953)
Failures of main steam isolation valves.
Published: (1988)
Published: (1988)
Water hammer : practical solutions /
by: Sharp, B. B.
Published: (1996)
by: Sharp, B. B.
Published: (1996)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Malfunction of Borg-Warner bolted bonnet check valves caused by failure of the swing arm.
Published: (1990)
Published: (1990)
Waterhammer : practice - criteria - provisions - mathematical description - examples /
by: Wijdieks, J.
Published: (1983)
by: Wijdieks, J.
Published: (1983)
Water hammer in large oil transmission lines /
by: Wijdieks, J.
Published: (1972)
by: Wijdieks, J.
Published: (1972)
Main steam isolation valve (MSIV) leakage.
Published: (1982)
Published: (1982)
Water hammer : practical solutions /
by: Sharp, B. B.
Published: (1996)
by: Sharp, B. B.
Published: (1996)
Failure of check and stop check valves subjected to low flow conditions.
Published: (1986)
Published: (1986)