Inadequate surveillance and postmaintenance and postmodification system testing.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1985.
|
| Series: | NRC information notice ;
85-23. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo146862 |
Similar Items
Inadequate testing to detect failures of safety-related pneumatic components or systems.
Published: (1986)
Published: (1986)
Inadequate local leak rate testing.
Published: (1992)
Published: (1992)
Main steam isolation valve failure to close on demand because of inadequate maintenance and testing.
Published: (1994)
Published: (1994)
Safety-related (1) motor-operated valve testing and surveillance results of the public workshops.
Published: (1989)
Published: (1989)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)
Published: (1981)
Potential for surveillance testing to fail to detect an inoperable main steam isolation valve.
Published: (1994)
Published: (1994)
Setpoint testing of pressurizer safety valves with filled loop seals using hydraulic assist devices.
Published: (1988)
Published: (1988)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
Check valve inservice testing program deficiencies.
Published: (1988)
Published: (1988)
Preliminary results of validation testing of motor-operated valve diagnostic equipment.
Published: (1991)
Published: (1991)
Improperly installed instrumentation, inadequate quality control and inadequate postmodification testing.
Published: (1985)
Published: (1985)
inadequate main steam safety valve (MSSV) setpoints and performance issues associated with long MSSV inlet piping.
Published: (1997)
Published: (1997)
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /
by: Bedi, Gurjendra S.
Published: (2013)
by: Bedi, Gurjendra S.
Published: (2013)
Testing of parallel disc gate valves in Europe.
Published: (1990)
Published: (1990)
Results of validation testing of motor-operated valve diagnosis equipment.
Published: (1992)
Published: (1992)
Inoperability of power-operated relief valves masked by downstream indications during testing.
Published: (1996)
Published: (1996)
Malfunction of a pressurized code safety valve.
Published: (1993)
Published: (1993)
Detached check valve disc not detected by use of acoustic and magnetic nonintrusive test techniques.
Published: (2000)
Published: (2000)
NRC inspections of programs being developed at nuclear power plants in response to Generic Letter 89-10.
Published: (1992)
Published: (1992)
Accuracy of motor-operated valve diagnostic equipment (responses to supplement 5 to Generic Letter 89-10).
Published: (1994)
Published: (1994)
Recent NRC-sponsored testing of motor-operated valves.
Published: (1989)
Published: (1989)
Results of NRC-sponsored testing of motor-operated valves.
Published: (1990)
Published: (1990)
Main steam safety valve test failures and ringed setting adjustments.
Published: (1986)
Published: (1986)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Cladding behavior during postulated loss-of-coolant accidents /
by: Billone, M. C.
Published: (2016)
by: Billone, M. C.
Published: (2016)
Testing and operations-induced degradation of 3-stage Target Rock safety/relief valves.
Published: (2018)
Published: (2018)
Motor-operated valve actuator thrust variations measured with a torque thrust cell and a strain gage.
Published: (1993)
Published: (1993)
Valves for power plant development and testing : international conference, 4-6 April 1989, University of Southampton /
Published: (1989)
Published: (1989)
Failure of a main steam safety valve to reseat caused by an improperly installed release nut.
Published: (1996)
Published: (1996)
Air actuator and supply air regulator problems in Copes-Vulcan pressurizer power-operated reliel valves.
Published: (1995)
Published: (1995)
Instrument failure causes opening of PORV and block valve.
Published: (1980)
Published: (1980)
Dependency of offset disc butterfly valve's operation on orientation with respect to flow.
Published: (1991)
Published: (1991)
Target rock two-stage SRV setpoint drift update.
Published: (1988)
Published: (1988)
Broken retaining block studs on Anchor Darling check valves.
Published: (1988)
Published: (1988)
Potentially substandard valve replacement parts.
Published: (1988)
Published: (1988)
Results of the NRC-sponsored qualification methodology research test on ASCO solenoid valves.
Published: (1984)
Published: (1984)
Accuracy of motor-operated valve diagnostic equipment manufactured by Liberty Technologies.
Published: (1993)
Published: (1993)
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment /
by: Bedi, Gurjendra S.
Published: (2011)
by: Bedi, Gurjendra S.
Published: (2011)
Plant outage events involving poor coordination between operations and maintenance personnel during valve testing and manipulations.
Published: (1991)
Published: (1991)