Main steam isolation valve closure logic.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1985.
|
| Series: | NRC information notice ;
85-21. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo146860 |
Similar Items
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)
Published: (1981)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Main steam isolation valve (MSIV) leakage.
Published: (1982)
Published: (1982)
Failures of main steam isolation valves.
Published: (1988)
Published: (1988)
Primary containment isolation valve discrepancies.
Published: (1983)
Published: (1983)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
LWR primary coolant system pressure isolation valves.
Published: (1980)
Published: (1980)
Failure of Rockwell-Edward main steam isolation valves.
Published: (1981)
Published: (1981)
Failure to close service water cross-connect isolation valves.
Published: (1989)
Published: (1989)
Broken inner-external closure springs on Atwood & Morrill main steam isolation valves.
Published: (1986)
Published: (1986)
Main steam isolation valve failure events.
Published: (2015)
Published: (2015)
Unit startup with degraded high pressure safety injection system.
Published: (1986)
Published: (1986)
Undetected modification of flow characteristics in the high pressure safety Injection system.
Published: (1993)
Published: (1993)
Main steam safety valve setpoint variation as a result of thermal effects.
Published: (1996)
Published: (1996)
Availability of NUREG-1169, "Technical findings related to Generic Issue C-8; boiling water reactor main steam isolation valve leakage and leakage treatment methods".
Published: (1986)
Published: (1986)
Failure of main steam isolation valves as a result of sticking solenoid pilot valves.
Published: (1995)
Published: (1995)
Failures of main steam isolation check valves resulting in disc separation.
Published: (1990)
Published: (1990)
Main steam isolation valve failure to close on demand because of inadequate maintenance and testing.
Published: (1994)
Published: (1994)
Common mode failure of main steam isolation nonreturn check valves.
Published: (1983)
Published: (1983)
Changes In pressurizer safety valve setpoints before installation.
Published: (1991)
Published: (1991)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Direction-dependent leak characteristics of containment purge valves.
Published: (1988)
Published: (1988)
Shaft seal packing causes binding in main steam swing disc check and isolation valves.
Published: (1980)
Published: (1980)
Reduction of reactor coolant inventory because of misalignment of RHR valves.
Published: (1986)
Published: (1986)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
Potential for surveillance testing to fail to detect an inoperable main steam isolation valve.
Published: (1994)
Published: (1994)
Containment purging and venting during normal operation--guidelines for valve operability.
Published: (1979)
Published: (1979)
Periodic verification of leak tight integrity of pressure isolation valves.
Published: (1987)
Published: (1987)
Loss of high head safety injection.
Published: (1992)
Published: (1992)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Thermally induced pressure locking of a high pressure coolant injection valve.
Published: (1996)
Published: (1996)
Multiple-subsequent actuation of safety/relief valves following an isolation event.
Published: (1978)
Published: (1978)
Leaking shutdown cooling isolation valves at Cooper Nuclear Station.
Published: (1994)
Published: (1994)
Inadequacies in the design of DC motor-operated valves.
Published: (1988)
Published: (1988)
Failure of a main steam safety valve to reseat caused by an improperly installed release nut.
Published: (1996)
Published: (1996)
Failure of auxiliary feedwater manual isolation valve.
Published: (1986)
Published: (1986)
Suceptibility of low-pressure coolant injection and core spray injection valves to pressure locking.
Published: (1995)
Published: (1995)
Potentially undersized valve actuators.
Published: (1988)
Published: (1988)