Isolation transfer switches and post-fire shutdown capability.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1985.
|
| Series: | NRC information notice ;
85-09. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo146848 |
Similar Items
Switchgear fire and partial loss of offsite power at Waterford Generating Station, Unit 3.
Published: (1995)
Published: (1995)
Fire dynamics tools (FDTs) quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission fire protection inspection program : supplement 1 /
by: Stroup, D., et al.
Published: (2012)
by: Stroup, D., et al.
Published: (2012)
Malfunctions of ITT Barton model 580 series switches during requalification testing.
Published: (1986)
Published: (1986)
Permanent deformation of torque switch helical springs in Limitorque SMA-type motor operators.
Published: (1989)
Published: (1989)
Joint a̲ssessment of c̲able damage and q̲uantification of e̲ffects from fi̲r̲e̲ (JACQUE-FIRE) : final report.
Published: (2012)
Published: (2012)
Auxiliary feedwater pump lockout resulting from Westinghouse W-2 switch circuit modification.
Published: (1982)
Published: (1982)
Single-failure and fire vunerability of redundant electrical safety buses.
Published: (2005)
Published: (2005)
Erratic behavior of static "O" ring differential pressure switches.
Published: (1986)
Published: (1986)
Thermo-lag 330-660 flexi-blanket ampacity derating concerns.
Published: (1994)
Published: (1994)
Failure to ensure that post-fire shutdown procedures can be performed.
Published: (2010)
Published: (2010)
Knowledge base for post-fire safe-shutdown analysis : draft report for comment /
by: Salley, M. H.
Published: (2004)
by: Salley, M. H.
Published: (2004)
Knowledge base for post-fire safe-shutdown analysis : draft report for comment /
by: Salley, M. H.
Published: (2004)
by: Salley, M. H.
Published: (2004)
Failures caused by an improperly adjusted test link in 4.16 KV General Electric switchgear.
Published: (1991)
Published: (1991)
Potential for loss of remote shutdown capability during a control room fire.
Published: (1992)
Published: (1992)
Improper electrical grounding results in simultaneous fires in the control room and safe-shutdown equipment room.
Published: (1997)
Published: (1997)
Electrical cable test results and analysis during fire exposure (ELECTRA-FIRE) : a consolidation of three major fire-induced circuit and cable failure experiments performed between 2001 and 2011 ; final report /
by: Taylor, G.
Published: (2012)
by: Taylor, G.
Published: (2012)
Electrical arc flash caused by foreign material damages fire door.
Published: (2018)
Published: (2018)
Potential circuit failure-induced secondary fires or equipment damage.
Published: (2014)
Published: (2014)
Motor-operated valve torque switches set below the manufacturer's recommended value.
Published: (1984)
Published: (1984)
Cable heat release, ignition, and spread in tray installations during fire (CHRISTIFIRE) /
by: McGrattan, Kevin B.
Published: (2012)
by: McGrattan, Kevin B.
Published: (2012)
Cable heat release, ignition and spread in tray installations during fire (CHRISTIFIRE) : volume 1, horizontal trays, draft report for comment /
Published: (2010)
Published: (2010)
Tests and criteria for fire protection of cable penetrations.
by: Williamson, Robert Brady
Published: (1981)
by: Williamson, Robert Brady
Published: (1981)
General Electric type SBM control switches with defective cam followers.
Published: (2003)
Published: (2003)
General Electric type SBM control switches defective cam followers.
Published: (1980)
Published: (1980)
Cable insulation resistance measurements made during cable fire tests /
by: Wyant, Francis J.
Published: (2002)
by: Wyant, Francis J.
Published: (2002)
Cable insulation resistance measurements made during cable fire tests /
by: Wyant, Francis J.
Published: (2002)
by: Wyant, Francis J.
Published: (2002)
Failures of Class 1E safety-related switchgear circuit breakers to close on demand.
Published: (1983)
Published: (1983)
Electric raceway fire barrier systems in U.S. nuclear power plants : final report /
by: Taylor, Gabriel J.
Published: (2010)
by: Taylor, Gabriel J.
Published: (2010)
Electric raceway fire barrier systems in U.S. nuclear power plants : draft report for comment /
by: Taylor, G.
Published: (2009)
by: Taylor, G.
Published: (2009)
Fire risk analysis, fire simulation, fire spreading and impact of smoke and heat on instrumentation electronics : state-of-the-art report.
Published: (2000)
Published: (2000)
Regulatory guide 1.191 : fire protection program for nuclear power plants during decommissioning and permanent shutdown.
Published: (2001)
Published: (2001)
Corrosion in fire protection piping due to air and water interaction.
Published: (2013)
Published: (2013)
Nuclear power plant fire protection.
by: Milloy, John A.
Published: (1979)
by: Milloy, John A.
Published: (1979)
Fire protection.
Published: (1980)
Published: (1980)
Framework for low power/shutdown fire PRA : final report /
by: Nowlen, S. P., et al.
Published: (2013)
by: Nowlen, S. P., et al.
Published: (2013)
Fire protection rule.
Published: (1980)
Published: (1980)
Risk methods insights gained from fire incidents /
by: Nowlen, S. P.
Published: (2001)
by: Nowlen, S. P.
Published: (2001)
Risk methods insights gained from fire incidents /
by: Nowlen, S. P.
Published: (2001)
by: Nowlen, S. P.
Published: (2001)
Compensatory and Alternative Regulatory MEasures for Nuclear power plant FIRE protection (CARMEN-FIRE) /
by: Sullivan, K. (Kenneth), 1950-
Published: (2015)
by: Sullivan, K. (Kenneth), 1950-
Published: (2015)
Methodology for low power/shutdown fire PRA : draft report for comment /
by: Nowlen, S. P.
by: Nowlen, S. P.