Equipment availability for conditions during outages not covered by technical specifications.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, DC :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1984.
|
| Series: | Information notice ;
84-42. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo146486 |
Similar Items
Equipment operability under degraded voltage conditions.
Published: (2007)
Published: (2007)
Indicators for management of planned outages in nuclear power plants.
Published: (2006)
Published: (2006)
Site area emergency resulting from a loss of non-class 1E uninterruptible power supplies.
Published: (1991)
Published: (1991)
Plant outage events involving poor coordination between operations and maintenance personnel during valve testing and manipulations.
Published: (1991)
Published: (1991)
Analyzing operator actions during loss of ac power accident with subsequent loss of secondary heat sink /
by: Parzer, I.
Published: (2010)
by: Parzer, I.
Published: (2010)
Partial loss of non-nuclear instrument system power supply during operation.
Published: (1980)
Published: (1980)
Electrical distrribution system failures affecting security equipment.
Published: (2005)
Published: (2005)
Electrical distribution systems failures affecting security equipment.
Published: (2005)
Published: (2005)
Four plant outage events involving loss of AC power or coolant spills.
Published: (1991)
Published: (1991)
Switchyard problems that contribute to loss of offsite power.
Published: (1991)
Published: (1991)
Sustained degraded voltage on the offsite electrical grid and loss of other generating stations as a result of a plant trip.
Published: (1989)
Published: (1989)
Excessive voltage drop in DC systems.
Published: (1989)
Published: (1989)
Loss of offsite power upon an automatic bus transfer.
Published: (1986)
Published: (1986)
Spurious relay actuations result in loss of power to safeguards buses.
Published: (2009)
Published: (2009)
Age/environment induced electrical cable failures.
Published: (1986)
Published: (1986)
Operating experience regarding failure to meet technical specifications requirements for changing plant conditions.
Published: (2018)
Published: (2018)
Availability of alternate AC power source designed for station blackout event.
Published: (1997)
Published: (1997)
Loss of vital AC power with subsequent reactor coolant system heat-up.
Published: (1990)
Published: (1990)
Observations from recent shutdown risk and outage management pilot team inspections.
Published: (1993)
Published: (1993)
Loss of offsite power to vital-buses at Salem 2.
Published: (1986)
Published: (1986)
Diesel generator failure at Calvert Cliffs Nuclear Station Unit 1.
Published: (1985)
Published: (1985)
Emergency procedures and training for station blackout events.
Published: (1981)
Published: (1981)
Plant trip and loss of preferred AC power from inadequate switchyard maintenance.
Published: (2005)
Published: (2005)
Removal of component lists from technical specifications.
Published: (1991)
Published: (1991)
Effect of circuit breaker capacitance on availability of emergency power.
Published: (1988)
Published: (1988)
Loss of offsite power caused by problems in fiber optics systems.
Published: (1986)
Published: (1986)
Nuclear power plant availability, maintenance and operation : proceedings of an International Symposium on Advances in Nuclear Power Plant Availability, Maintainability and Operation /
Published: (1985)
Published: (1985)
GI-23, "Reactor coolant pump seal failures" and its possible effect on station blackout.
Published: (1991)
Published: (1991)
Review of refueling outage risk.
Published: (2000)
Published: (2000)
Electrical systems for nuclear power plants /
by: Mazzoni, Omar S.
Published: (2018)
by: Mazzoni, Omar S.
Published: (2018)
Line-item technical specifications improvements to reduce surveillance requirements for testing during power operation.
Published: (1993)
Published: (1993)
Operation with steam generator tubes seriously degraded.
Published: (1992)
Published: (1992)
Nuclear power plant outage experience : proceedings of an International Symposium on Nuclear Power Plant Outage Experience organized by the International Atomic Energy Agency, and held in Karlsruhe, 18-21 June 1984.
Published: (1984)
Published: (1984)
Overloading and subsequent lockout of electrical buses during accident conditions.
Published: (1992)
Published: (1992)
Potential electrical equipment problems.
Published: (1989)
Published: (1989)
Arizona-Southern California outages on September 8, 2011 : causes and recommendations /
Published: (2012)
Published: (2012)
Reactor trips resulting from water intrusion into electrical equipment.
Published: (2011)
Published: (2011)
Issuance of NUREG-0588, "Interim staff position on equipment qualifications of safety-related electrical equipment".
Published: (1980)
Published: (1980)
Qualification of safety related electrical equipment.
Published: (1980)
Published: (1980)
Control of maintenance and essential equipment.
Published: (1979)
Published: (1979)