Life cycle costing for facilities : economic analysis for owners and professionals in planning, programming, and real estate development : designing, specifying, and construction, maintenance, operations, and procurement /
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Language: | English |
| Published: |
Kingston, MA :
Reed Construction Data,
[2003]
|
| Subjects: |
Table of Contents:
- Management Briefing
- Life Cycle Costing
- Introduction to LLC
- Recent Trends that Support the Need for Life Cycle Costing
- LCC for Design Professionals
- What is Life Cycle Costing?
- Life Cycle Costing Logic
- Application in the Design Process
- Relationship of LCC to Value Engineering
- Program Requirements
- Life Cycle Costing Fundamentals
- Time Value of Money
- Life Cycle
- Discount Rate
- Dealing with Inflation and Cost Growth
- Analysis Period
- Present Time
- Costs
- Economic Analysis
- Terminology
- Office Economic Analysis Example
- Types of Economic Analysis
- Benefits and Costs
- Economic Analysis Approaches
- Life Cycle Cost Analysis
- Life Cycle Cost Analysis
- Present Worth Method Calculations
- Annualized Method Calculations
- LCCA Calculation Worksheets
- LCCA Spreadsheet
- More Complex LCC Analyses
- Estimating Life Cycle Costs
- Estimating Framework
- Initial Costs
- Energy Costs
- Maintenance, Repair, and Custodial Costs
- Alteration and Replacement Costs
- Associated Costs
- Economic Risk Assessment
- Range of Probable Values
- Confidence Index (CI) Approach
- Conducting an LCCA Study
- Identifying Economic Criteria
- Generating Design Alternatives
- Preliminary Evaluation
- Evaluating Life Cycle Costs and Benefits
- Selecting the Design Alternative
- Alternative Ranking/Selection
- Example LCCA Study
- Office to Museum Renovation
- District Court Consolidation
- Branch Bank Prototype Layout
- Health Care Facility Layout
- Daylighting.
- Glass/HVAC Replacement
- Lighting System
- Elevator Selection
- Equipment Purchase Examples
- Construction and Service Contracts
- Chemical Stabilization Plant
- Dryers vs. Windows
- Campus University Planning Using LCC and Choosing by Advantages
- High School Trade-Off Analysis of Initial vs. Staffing Costs
- Highway for Regional Transportation Authority
- Life Cycle Cost Assessment
- HVAC System for a High School
- Lease vs. Build LCC Analysis
- Management Considerations
- Strengths and Weaknesses of Life Cycle Costing
- Level of Effort
- Planning the Overall Study Effort
- Contingency Planning
- Life Cycle Cost Data
- Introduction to Cost Data
- Maintenance & Replacement Estimating Data
- Structural
- Architectural
- Mechanical
- Electrical
- Equipment
- Sitework
- Economic Tables
- Energy-Estimating Data
- Elevator and Escalator LCC Considerations
- Sample LCC Scope of Services
- Life Cycle Costing Forms
- Selected Government Requirements for LCC
- Historical Development of LCC.