Overloading and subsequent lockout of electrical buses during accident conditions.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
[1992]
|
| Series: | NRC information notice ;
92-09. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo65214 |
Similar Items
Analyzing operator actions during loss of ac power accident with subsequent loss of secondary heat sink /
by: Parzer, I.
Published: (2010)
by: Parzer, I.
Published: (2010)
Reactor trips resulting from water intrusion into electrical equipment.
Published: (2011)
Published: (2011)
Loss of offsite power to vital-buses at Salem 2.
Published: (1986)
Published: (1986)
Spurious relay actuations result in loss of power to safeguards buses.
Published: (2009)
Published: (2009)
Resolution of generic issues 48, "LCOs for class 1E vital instrument buses," and 49, "Interlocks and LCOs for class 1E tie breakers" pursuant to 10 CFR 50.54(f).
Published: (1991)
Published: (1991)
Single-failure and fire vunerability of redundant electrical safety buses.
Published: (2005)
Published: (2005)
Electrical systems for nuclear power plants /
by: Mazzoni, Omar S.
Published: (2018)
by: Mazzoni, Omar S.
Published: (2018)
Environmental tests of electrical terminal blocks.
Published: (1982)
Published: (1982)
Assurance of equipment operability and containment integrity during design-basis accident conditions.
Published: (1996)
Published: (1996)
Qualification of safety related electrical equipment.
Published: (1980)
Published: (1980)
Nuclear accident /
by: Lampton, Christopher
Published: (1992)
by: Lampton, Christopher
Published: (1992)
Deficiencies identified during electrical distribution system functional inspections.
Published: (1991)
Published: (1991)
Anchorage and support of safety-related electrical equipment.
Published: (1980)
Published: (1980)
Environmental qualification of safety-related electrical equipment.
Published: (1982)
Published: (1982)
Loss of vital AC power with subsequent reactor coolant system heat-up.
Published: (1990)
Published: (1990)
Orders on environmental qualification of safety related electrical equipment.
Published: (1980)
Published: (1980)
Deficient electrical terminations identified in safety-related components.
Published: (1988)
Published: (1988)
Maintenance deficiency associated with General Electric horizontal custom 8000 induction motors.
Published: (1991)
Published: (1991)
Design vulnerability in electric power system.
Published: (2012)
Published: (2012)
Information regarding the program for environmental qualification of safety-related electrical equipment.
Published: (1981)
Published: (1981)
Potential electrical equipment problems.
Published: (1989)
Published: (1989)
Equipment availability for conditions during outages not covered by technical specifications.
Published: (1984)
Published: (1984)
Multiple-subsequent actuation of safety/relief valves following an isolation event.
Published: (1978)
Published: (1978)
Issuance of NUREG-0588, "Interim staff position on equipment qualifications of safety-related electrical equipment".
Published: (1980)
Published: (1980)
Auxiliary feedwater pump lockout resulting from Westinghouse W-2 switch circuit modification.
Published: (1982)
Published: (1982)
Failure of AMP window indent KYNAR splices and Thomas and Betts nylon wire caps during environmental qualification testing.
Published: (1988)
Published: (1988)
Transformer failures--recent operating experiience.
Published: (2009)
Published: (2009)
Modified enforcement policy relating to 10 CFR 50.49, "Environmental qualification of electrical equipment important to safety for nuclear power plants".
Published: (1988)
Published: (1988)
Auditability of electrical equipment qualification records at licensees' facilities.
Published: (1985)
Published: (1985)
Source term evaluation for accident conditions : proceedings of an International Symposium on Source Term Evaluation for Accident Conditions /
Published: (1986)
Published: (1986)
Underrated terminal blocks that may adversely affect operation of essential electrical equipment.
Published: (1984)
Published: (1984)
Operating experience regarding failure to meet technical specifications requirements for changing plant conditions.
Published: (2018)
Published: (2018)
Mitigation of hydrogen hazards in severe accidents in nuclear power plants.
Published: (2011)
Published: (2011)
Potential problems with electrical relays.
Published: (1988)
Published: (1988)
Information on precursors to severe accidents.
Published: (1990)
Published: (1990)
Degraded DC system at Palisades.
Published: (1981)
Published: (1981)
Severe accident management programmes for nuclear power plants : safety guide /
Published: (2009)
Published: (2009)
Malfunction in main generator voltage regulator causing overvoltage at safety-related electrical equipment.
Published: (1994)
Published: (1994)
Environmental qualification tests of electrical terminal blocks.
Published: (1984)
Published: (1984)
Nuclear Accidents Prevention and Management of an Accidental Crisis.
by: Amiard, Jean-Claude
Published: (2020)
by: Amiard, Jean-Claude
Published: (2020)