Cladding behavior during postulated loss-of-coolant accidents /
| Main Author: | Billone, M. C. (Author) |
|---|---|
| Corporate Author: | U.S. Nuclear Regulatory Commission. Division of Systems Analysis (sponsoring body.) |
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington, DC :
United States Nuclear Regulatory Commission, Office of Nuclear Regulatory Research,
July 2016.
|
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo70902 |
Similar Items
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /
by: Bedi, Gurjendra S.
Published: (2013)
by: Bedi, Gurjendra S.
Published: (2013)
Setpoint testing of pressurizer safety valves with filled loop seals using hydraulic assist devices.
Published: (1988)
Published: (1988)
Safety-related (1) motor-operated valve testing and surveillance results of the public workshops.
Published: (1989)
Published: (1989)
Check valve inservice testing program deficiencies.
Published: (1988)
Published: (1988)
Preliminary results of validation testing of motor-operated valve diagnostic equipment.
Published: (1991)
Published: (1991)
NRC inspections of programs being developed at nuclear power plants in response to Generic Letter 89-10.
Published: (1992)
Published: (1992)
Inadequate surveillance and postmaintenance and postmodification system testing.
Published: (1985)
Published: (1985)
Accuracy of motor-operated valve diagnostic equipment (responses to supplement 5 to Generic Letter 89-10).
Published: (1994)
Published: (1994)
Malfunction of a pressurized code safety valve.
Published: (1993)
Published: (1993)
Inoperability of power-operated relief valves masked by downstream indications during testing.
Published: (1996)
Published: (1996)
Recent NRC-sponsored testing of motor-operated valves.
Published: (1989)
Published: (1989)
Results of NRC-sponsored testing of motor-operated valves.
Published: (1990)
Published: (1990)
Detached check valve disc not detected by use of acoustic and magnetic nonintrusive test techniques.
Published: (2000)
Published: (2000)
Testing of parallel disc gate valves in Europe.
Published: (1990)
Published: (1990)
Inadequate testing to detect failures of safety-related pneumatic components or systems.
Published: (1986)
Published: (1986)
Results of validation testing of motor-operated valve diagnosis equipment.
Published: (1992)
Published: (1992)
Main steam isolation valve failure to close on demand because of inadequate maintenance and testing.
Published: (1994)
Published: (1994)
Plant outage events involving poor coordination between operations and maintenance personnel during valve testing and manipulations.
Published: (1991)
Published: (1991)
Reduction of reactor coolant inventory because of misalignment of RHR valves.
Published: (1986)
Published: (1986)
Motor-operated valve actuator thrust variations measured with a torque thrust cell and a strain gage.
Published: (1993)
Published: (1993)
Main steam safety valve test failures and ringed setting adjustments.
Published: (1986)
Published: (1986)
Inadequate local leak rate testing.
Published: (1992)
Published: (1992)
Potential for surveillance testing to fail to detect an inoperable main steam isolation valve.
Published: (1994)
Published: (1994)
Accuracy of motor-operated valve diagnostic equipment manufactured by Liberty Technologies.
Published: (1993)
Published: (1993)
Thermally induced pressure locking of a high pressure coolant injection valve.
Published: (1996)
Published: (1996)
Suceptibility of low-pressure coolant injection and core spray injection valves to pressure locking.
Published: (1995)
Published: (1995)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Periodic verification of design-basis capability of safety-related motor-operated valves.
Published: (1996)
Published: (1996)
Potential for gas binding of high-pressure safety injection pumps during a loss-of-coolant accident.
Published: (1988)
Published: (1988)
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)
Published: (1981)
Potential effect of line-induced vibration on certain target rock solenoid-operated valves.
Published: (1985)
Published: (1985)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Potentially substandard valve replacement parts.
Published: (1988)
Published: (1988)
LWR primary coolant system pressure isolation valves.
Published: (1980)
Published: (1980)
Reversed differential pressure instrument sensing lines.
Published: (1984)
Published: (1984)
Degraded ability to isolate the reactor coolant system from low-pressure coolant systems in BWRS.
Published: (1986)
Published: (1986)
Alleged falsification of certifications and alteration of markings on piping, valves, and fittings.
Published: (1985)
Published: (1985)
Multiple-subsequent actuation of safety/relief valves following an isolation event.
Published: (1978)
Published: (1978)
Maintenance deficiency associated with solenoid-operated valves.
Published: (1990)
Published: (1990)
Failure of air check valves to seat.
Published: (1985)
Published: (1985)