Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /
| Main Author: | Bedi, Gurjendra S. (Author) |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington, DC :
Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission,
October 2013.
|
| Edition: | Revised 2. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo70684 http://purl.fdlp.gov/GPO/gpo70684 |
Similar Items
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment /
by: Bedi, Gurjendra S.
Published: (2011)
by: Bedi, Gurjendra S.
Published: (2011)
Inservice testing of pumps and valves, and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment /
by: Tingen, S. G.
Published: (2010)
by: Tingen, S. G.
Published: (2010)
Check valve inservice testing program deficiencies.
Published: (1988)
Published: (1988)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Recent NRC-sponsored testing of motor-operated valves.
Published: (1989)
Published: (1989)
Results of NRC-sponsored testing of motor-operated valves.
Published: (1990)
Published: (1990)
Preliminary results of validation testing of motor-operated valve diagnostic equipment.
Published: (1991)
Published: (1991)
Setpoint testing of pressurizer safety valves with filled loop seals using hydraulic assist devices.
Published: (1988)
Published: (1988)
Safety-related (1) motor-operated valve testing and surveillance results of the public workshops.
Published: (1989)
Published: (1989)
NRC inspections of programs being developed at nuclear power plants in response to Generic Letter 89-10.
Published: (1992)
Published: (1992)
Cladding behavior during postulated loss-of-coolant accidents /
by: Billone, M. C.
Published: (2016)
by: Billone, M. C.
Published: (2016)
Testing of parallel disc gate valves in Europe.
Published: (1990)
Published: (1990)
Inoperability of power-operated relief valves masked by downstream indications during testing.
Published: (1996)
Published: (1996)
Guidance on developing acceptable inservice testing programs.
Published: (1989)
Published: (1989)
Inadequate surveillance and postmaintenance and postmodification system testing.
Published: (1985)
Published: (1985)
Results of validation testing of motor-operated valve diagnosis equipment.
Published: (1992)
Published: (1992)
Detached check valve disc not detected by use of acoustic and magnetic nonintrusive test techniques.
Published: (2000)
Published: (2000)
Recent snubber inservice testing with high failure rates.
Published: (1984)
Published: (1984)
Main steam isolation valve failure to close on demand because of inadequate maintenance and testing.
Published: (1994)
Published: (1994)
Proceedings of the Ninth NRC/ASME Symposium on Valves, Pumps and Inservice Testing : held at L'Enfant Plaza Hotel Washington, DC, July 17-19, 2006 /
Published: (2007)
Published: (2007)
Proceedings of the Tenth NRC/ASME Symposium on Valves, Pumps and Inservice Testing : held at L'Enfant Plaza Hotel Washington, DC, July 14-16, 2008 /
Published: (2008)
Published: (2008)
Main steam safety valve test failures and ringed setting adjustments.
Published: (1986)
Published: (1986)
Potential for surveillance testing to fail to detect an inoperable main steam isolation valve.
Published: (1994)
Published: (1994)
Malfunction of a pressurized code safety valve.
Published: (1993)
Published: (1993)
Plant outage events involving poor coordination between operations and maintenance personnel during valve testing and manipulations.
Published: (1991)
Published: (1991)
Accuracy of motor-operated valve diagnostic equipment (responses to supplement 5 to Generic Letter 89-10).
Published: (1994)
Published: (1994)
Inadequate testing to detect failures of safety-related pneumatic components or systems.
Published: (1986)
Published: (1986)
Inadequate local leak rate testing.
Published: (1992)
Published: (1992)
Operating problems with solenoid operated valves at nuclear power plants.
Published: (1986)
Published: (1986)
Lessons learned from U.S. Nuclear Regulatory Commission inspections of design-basis capability of power-operated valves at nuclear power plants.
Published: (2021)
Published: (2021)
A study of air-operated valves in U.S. nuclear power plants /
by: Rothberg, O. (Owen)
Published: (2000)
by: Rothberg, O. (Owen)
Published: (2000)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Accuracy of motor-operated valve diagnostic equipment manufactured by Liberty Technologies.
Published: (1993)
Published: (1993)
Testing and operations-induced degradation of 3-stage Target Rock safety/relief valves.
Published: (2018)
Published: (2018)
Motor-operated valve actuator thrust variations measured with a torque thrust cell and a strain gage.
Published: (1993)
Published: (1993)
Valves for power plant development and testing : international conference, 4-6 April 1989, University of Southampton /
Published: (1989)
Published: (1989)
Periodic verification of design-basis capability of safety-related motor-operated valves.
Published: (1996)
Published: (1996)
Westinghouse motor-operated valve performance data supplied to nuclear power plant licensees.
Published: (1992)
Published: (1992)
Proceedings of the ... NRC/ASME Symposium on Valves, Pumps, and Inservice Testing /
Published: (2007)
Published: (2007)
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)
Published: (1981)