Detailed instructions for preparation of plans of industrial alcohol plants, bonded warehouses, denaturing plants, rum, whisky and brandy distilleries, and distillery warehouses, painting of pipelines of such plants and sealing of equipment, in pursuance of existing regulations.

Bibliographic Details
Format: Government Document eBook
Language:English
Published: Washington, D.C. : [publisher not identified], 1932.
Series:Industrial Alcohol Bur. Circ. Letter No. 111
Subjects:
Online Access:Connect to the full text of this electronic document

MARC

Tag First Indicator Second Indicator Subfields
LEADER 00000cam a22000001a 4500
001 in00003666513
005 20190408174101.0
006 m o d f
007 cr bn mmmapmmp
008 030810s1932 dcu o f000 0 eng d
035 |a ebd191006319 
040 |a UMI  |c UMI  |d UtOrBLW 
086 0 |a T 54.10:111 
099 |a T54.10-111 
245 0 0 |a Detailed instructions for preparation of plans of industrial alcohol plants, bonded warehouses, denaturing plants, rum, whisky and brandy distilleries, and distillery warehouses, painting of pipelines of such plants and sealing of equipment, in pursuance of existing regulations. 
264 1 |a Washington, D.C. :  |b [publisher not identified],  |c 1932. 
300 |a 1 online resource (4 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 0 |a Industrial Alcohol Bur. Circ. Letter No. 111 
500 |a Record is based on bibliographic data in ProQuest U.S. Executive Branch Documents, 1910-1932. Reuse except for individual research requires license from ProQuest, LLC. 
533 |a Electronic reproduction.  |b [Bethesda, Md.] :  |c ProQuest,  |d 2012.  |e digital, PDF file.  |n ProQuest U.S. Executive Branch Documents, 1910-1932.  |n Mode of access: World Wide Web via ProQuest website. 
538 |a System requirements: PDF reader software. 
500 |a Electronic resource. 
650 0 |a Warehouses.  |0 http://id.loc.gov/authorities/subjects/sh85145251 
655 7 |a Electronic books.  |2 local 
776 1 8 |i Microfiche version:  |t Detailed instructions for preparation of plans of industrial alcohol plants, bonded warehouses, denaturing plants, rum, whisky and brandy distilleries, and distillery warehouses, painting of pipelines of such plants and sealing of equipment, in pursuance of existing regulations  |d [Bethesda, Md.] : ProQuest,[2012]  |o CIS US Exec MF T54.10-111  |w (ProQuest)cis19114068 
856 4 0 |u http://proxy.library.tamu.edu/login?url=http://congressional.proquest.com/congressional/docview/t66.d71.t54.10-111  |z Connect to the full text of this electronic document  |t 0 
999 f f |s 482fbec1-8c7d-3ee5-aa4a-b816dc2d5be0  |i cbd9d3ea-03b2-39de-9f83-76bb919f0da4  |t 0 
952 f f |a Texas A&M University  |b College Station  |c Electronic Resources  |d Available Online  |t 0  |h No information provided 
998 f f |t 0  |l Available Online