Beaty, C., Ellis, D. R., Glover, B., & Stockton, W. R. (2016). Assessing the costs attributed to project delay during project pre-construction stages. Texas A&M Transportation Institute.
Chicago Style (17th ed.) CitationBeaty, Curtis, David R. Ellis, Brianne Glover, and William R. Stockton. Assessing the Costs Attributed to Project Delay During Project Pre-construction Stages. College Station, Texas: Texas A&M Transportation Institute, 2016.
MLA (9th ed.) CitationBeaty, Curtis, et al. Assessing the Costs Attributed to Project Delay During Project Pre-construction Stages. Texas A&M Transportation Institute, 2016.
Warning: These citations may not always be 100% accurate.