Evaluation of traffic control devices, year 4 /
This project was established to provide a means of conducting small scale research activities on an as-needed basis so that the results could be available within months of starting the specific research. This report summarizes the research activities that were conducted between September 2011 and Au...
| Main Author: | |
|---|---|
| Corporate Authors: | , , |
| Other Authors: | , |
| Format: | eBook |
| Language: | English |
| Published: |
College Station, Tex. :
Texas A & M Transportation Institute,
2013.
|
| Series: | Research report (Austin, Tex.) ;
9-1001-3. |
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
| Summary: | This project was established to provide a means of conducting small scale research activities on an as-needed basis so that the results could be available within months of starting the specific research. This report summarizes the research activities that were conducted between September 2011 and August 2012. The research included two primary activities and two secondary activities. The two primary activities were: (1) Rural Intersection Sign Reduction Evaluation, and (2) Update on Sequential Dynamic Curve Warning System Research. The two secondary activities were: (1) Development of Hurricane Evacuation Animation Maps for the Corpus Christi District, and (2) Mobile Pavement Marking Retroreflectivity Data Training. |
|---|---|
| Item Description: | "Published: August 2013." Electronic resource. |
| Physical Description: | 1 online resource (ix, 29 pages) : illustrations (chiefly color), color maps. |
| Bibliography: | Includes bibliographical references (page 29). |