Nuclear powerplant licensing delays and the impact of the Sholly versus NRC decision : hearings before the Subcommittee on Nuclear Regulation of the Committee on Environment and Public Works, United States Senate, Ninety-seventh Congress, first session, March 25 and 31, 1981.

Bibliographic Details
Corporate Authors: United States. Congress. Senate. Committee on Environment and Public Works. Subcommittee on Nuclear Regulation, ProQuest (Firm)
Format: Government Document eBook
Language:English
Published: Washington : U.S. G.P.O., 1981.
Series:U.S. Congressional Hearings.
Subjects:
Online Access:Connect to the full text of this electronic book

MARC

Tag First Indicator Second Indicator Subfields
LEADER 00000cam a22000001a 4500
001 in00003260021
006 m d f
007 cr bn mmmapmmp
008 100322s1981 dcu ob f000 0 eng d
005 20260504145525.3
035 |a cis2007494101 
040 |a UMI  |c UMI  |d UtOrBLW 
043 |a n-us--- 
074 |a 1045-A, 1045-B (microfiche) 
086 0 |a Y 4.P 96/10:97-H 11 
088 |a Serial No. 97-H 11 (United States. Congress. Senate. Committee on Environment and Public Works) 
099 |a HRG-1981-PWO-0008 
110 1 |a United States.  |b Congress.  |b Senate.  |b Committee on Environment and Public Works.  |b Subcommittee on Nuclear Regulation. 
245 1 0 |a Nuclear powerplant licensing delays and the impact of the Sholly versus NRC decision :  |b hearings before the Subcommittee on Nuclear Regulation of the Committee on Environment and Public Works, United States Senate, Ninety-seventh Congress, first session, March 25 and 31, 1981. 
264 1 |a Washington :  |b U.S. G.P.O.,  |c 1981. 
300 |a 1 online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC. 
504 |a Includes bibliographical references. 
538 |a System requirements: PDF reader software. 
500 |a Electronic resource. 
650 0 |a Nuclear power plants  |x Licenses  |z United States. 
655 7 |a Electronic books.  |2 local 
710 2 |a ProQuest (Firm) 
776 0 8 |i Print version:   |a United States. Congress. Senate. Committee on Environment and Public Works. Subcommittee on Nuclear Regulation.  |t Nuclear powerplant licensing delays and the impact of the Sholly versus NRC decision  |w (DLC)81603080  |w (OCoLC)07833598  |w gp 81014933 
776 0 8 |i Microfiche version:   |a United States. Congress. Senate. Committee on Environment and Public Works. Subcommittee on Nuclear Regulation.  |t Nuclear powerplant licensing delays and the impact of the Sholly versus NRC decision.  |d [Bethesda, Md.] : ProQuest,[2004]  |o CIS 81 S321-18  |w (ProQuest)cis08102130 
830 0 |a U.S. Congressional Hearings. 
856 4 0 |u http://proxy.library.tamu.edu/login?url=https://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1981-PWO-0008  |z Connect to the full text of this electronic book  |t 0 
998 |a cis08102130 
999 |a MARS 
999 f f |s e6e99a83-f6e6-34fd-b529-a83c2b1b7ae0  |i 10323246-68b0-3a25-8a35-93e83407c2a8  |t 0 
952 f f |a Texas A&M University  |b College Station  |c Electronic Resources  |s www_evans  |d Available Online  |t 0  |e HRG-1981-PWO-0008  |h Other scheme 
998 f f |a HRG-1981-PWO-0008  |t 0  |l Available Online