Third Powerplant, Columbia Basin Project, Washington : hearings before the United States House Committee on Interior and Insular Affairs, Subcommittee on Irrigation and Reclamation, Eighty-Ninth Congress, first session, on Sept. 9, 10, 1965.
Committee Serial No. 18. Considers H.R. 7406, to authorize Interior Dept to construct, operate, and maintain a third power plant at the Grand Coulee Dam, Columbia Basin Project, Washington State.
| Corporate Authors: | , |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington :
U.S. G.P.O.,
1965.
|
| Series: | U.S. Congressional Hearings.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
| Summary: | Committee Serial No. 18. Considers H.R. 7406, to authorize Interior Dept to construct, operate, and maintain a third power plant at the Grand Coulee Dam, Columbia Basin Project, Washington State. Considers (89) H.R. 8197, (89) S. 1761, (89) H.R. 7406. |
|---|---|
| Item Description: | Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC. Electronic resource. |
| Physical Description: | 1 online resource. |
| Format: | System requirements: PDF reader software. |