Authorizing the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects.
| Corporate Authors: | United States. Congress. House. Committee of Conference, ProQuest (Firm) |
|---|---|
| Format: | eBook |
| Language: | English |
| Published: |
Washington :
[publisher not identified],
1956.
|
| Series: | United States congressional serial set.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Similar Items
Authorizing the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects.
Published: (1956)
Published: (1956)
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam Project, Washington.
Published: (1954)
Published: (1954)
Authorizing the Secretary of the Interior to construct, operate, and maintain the Collabran reclamation project, Colorado.
Published: (1951)
Published: (1951)
Authorizing the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects.
Published: (1954)
Published: (1954)
Authorizing the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects.
Published: (1954)
Published: (1954)
Authorizing Construction, Operation, and Maintenance of the Narrows Unit, Missouri River Basin Project, Colorado.
Published: (1970)
Published: (1970)
Excess cost to contractors incurred while constructing dams and locks on Mississippi River.
Published: (1937)
Published: (1937)
Authorizing the Palisades Dam and Reservoir project, authorizing the north side pumping division and related works, providing for the disposition of reserved space in American Falls Reservoir.
Published: (1950)
Published: (1950)
Operation of Muscle Shoals properties, etc.
Published: (1933)
Published: (1933)
Dam across Savannah River.
Published: (1912)
Published: (1912)
Providing for the construction, operation, and maintenance of the Savery-Pot Hook, Bostwick Park, and Fruitland Mesa participating reclamation projects under the Colorado River Storage Project Act.
Published: (1964)
Published: (1964)
Providing for the construction, operation, and maintenance of the Savery-Pot Hook, Bostwick Park, and Fruitland Mesa participating reclamation projects under the Colorado River Storage Project Act.
Published: (1964)
Published: (1964)
Construction of small reservoirs under federal reclamation laws.
Published: (1937)
Published: (1937)
Letter from the Secretary of the Interior transmitting the first annual report on the status of the Colorado River storage project and participating projects together with a statement on hydrologic bases for financial studies, Colorado River storage project, pursuant to Public Law 485 of the Eighty-fourth Congress.
Published: (1957)
Published: (1957)
Authorizing the negotiation and ratification of separate settlement contracts with the Sioux Indians of Cheyenne River Reservation in South Dakota and of Standing Rock Reservation in South Dakota and North Dakota for Indian lands and rights acquired by the United States for the Oahe Dam and Reservoir, Missouri River development.
Published: (1950)
Published: (1950)
Authorizations for reservoirs, levees, and flood walls for flood control.
Published: (1941)
Published: (1941)
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek Division of the Chief Joseph Dam project, Washington.
Published: (1954)
Published: (1954)
Authorizing the Secretary of the Interior to construct operate, and maintain four units of the Greater Wenatchee Division, Chief Joseph Project, Washington.
Published: (1958)
Published: (1958)
Authorizing the Secretary of the Interior to construct, operate, and maintain the San Felipe Division, Central Valley Project, California, and for other purposes.
Published: (1967)
Published: (1967)
Authorizing the Secretary of the Interior to construct, operate, and maintain four units of the greater Wenatchee division, Chief Joseph project, Washington.
Published: (1957)
Published: (1957)
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek Division of the Chief Joseph Dam project, Washington.
Published: (1953)
Published: (1953)
Authorizing the construction, operation, and maintenance of the Paonia Federal reclamation project, Colorado.
Published: (1947)
Published: (1947)
Authorizing the Secretary of the Interior to modify the operation of the Kortes unit, Missouri River Basin project, Wyoming.
Published: (1968)
Published: (1968)
Authorizing the construction, operation, and maintenance of the Paonia Federal reclamation project, Colorado.
Published: (1947)
Published: (1947)
Authorizing the Secretary of the Interior to make payment for certain improvements located on public lands in the Rapid Valley unit, South Dakota, of the Missouri River Basin project.
Published: (1956)
Published: (1956)
H.R. 3383, a Bill to Authorize the Secretary of the Interior to Construct, Operate, and Maintain the Colorado River Storage Project and Participating Project, and for other Purposes.
Published: (1956)
Published: (1956)
Authorizing the Secretary of the Interior to construct the Santa Maria Project, Southern Pacific Basin, Calif.
Published: (1954)
Published: (1954)
Colorado River storage project and participating projects.
Published: (1958)
Published: (1958)
Colorado River Storage Project and participating projects.
Published: (1963)
Published: (1963)
Colorado River storage project and participating projects.
Published: (1960)
Published: (1960)
Hydroelectric projects on the Colorado River.
Published: (1964)
Published: (1964)
Authorizing the Secretary of the Interior to make payment for certain improvements located on public lands in the Rapid Valley unit, South Dakota, of the Missouri River Basin project.
Published: (1956)
Published: (1956)
Authorizing the printing as a Senate document of the "Sixth Annual Report on the Status of the Colorado River Storage Project".
Published: (1963)
Published: (1963)
Preserving the jurisdiction of the Congress over construction of hydroelectric projects on the Colorado River below Glen Canyon Dam.
Published: (1964)
Published: (1964)
Paonia project, Colorado.
Published: (1947)
Published: (1947)
Authorizing the Secretary of the Interior to make water available for a permanent pool for recreation purposes at Cochiti Reservoir from the San Juan-Chama unit of the Colorado River storage project.
Published: (1963)
Published: (1963)
Participation in costs and benefits of Tongue River Storage Reservoir.
Published: (1939)
Published: (1939)
Authorizing the Secretary of the Interior to investigate and report to the Congress on projects for the conservation, development, and utilization of the water resources of Alaska.
Published: (1955)
Published: (1955)
River and harbor, beach erosion, and flood control projects.
Published: (1956)
Published: (1956)
Authorizing the Secretary of the Interior to construct, operate, and maintain the Collbran reclamation project, Colorado.
Published: (1952)
Published: (1952)