Power plant on the Pima Indian Reservation, Maricopa County, Ariz.
| Corporate Authors: | United States. Congress. House. Committee on Indian Affairs, ProQuest (Firm) |
|---|---|
| Format: | eBook |
| Language: | English |
| Published: |
Washington :
[publisher not identified],
1900.
|
| Series: | United States congressional serial set.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Similar Items
Quality of water and estimates of water inflow, northern boundary area, Fort McDowell Indian Reservation, Maricopa County, Arizona /
by: Hoffmann, John P.
Published: (2001)
by: Hoffmann, John P.
Published: (2001)
Settlement of the water claims of the Salt River Pima-Maricopa Indian Community in Maricopa County, Arizona : joint hearing before the Select Committee on Indian Affairs, United States Senate and the Committee on Interior and Insular Affairs, U.S. House of Representatives, One Hundredth Congress, second session, on S. 2153 ... and H.R. 4102 ... March 24, 1988, Washington, DC.
Published: (1989)
Published: (1989)
Ground-water conditions in the Avra Valley, Pima and Pinal counties, Arizona--1985 /
Published: (1987)
Published: (1987)
Methods for estimating water consumption for thermoelectric power plants in the United States /
by: Diehl, Timothy H.
Published: (2013)
by: Diehl, Timothy H.
Published: (2013)
West coast electric supply problems : hearing before the Subcommittee on Energy and Power, of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-fifth Congress, first session ... March 31, 1977.
Published: (1977)
Published: (1977)
Geohydrologic conditions in the Vekol Valley, Pinal and Maricopa counties, Arizona-1983 /
by: Cuff, Melinda K.
Published: (1984)
by: Cuff, Melinda K.
Published: (1984)
Utility Corporations. Letter from the Chairman of the Federal Trade Commission transmitting in response to Senate Resolution No. 83 a monthly report on the electric power and gas utilities inquiry together with exhibits in response to S. R. 112.
Published: (1931)
Published: (1931)
Defining and assessing adverse environmental impact from power plant impingement and entrainment of aquatic organisms /
Published: (2003)
Published: (2003)
Salt River Project, Arizona : Preliminary outline of power plant.
Published: (1905)
Published: (1905)
Geology and ground-water resources of McMullen Valley, Maricopa, Yavapai, and Yuma Counties, Arizona /
by: Kam, William, 1922-
Published: (1964)
by: Kam, William, 1922-
Published: (1964)
Water management by the electric power industry /
Published: (1975)
Published: (1975)
Evaporating prosperity : how federal actions are driving up water and power costs, threatening jobs and leaving Arizonans high and dry : oversight field hearing before the Subcommittee on Water and Power of the Committee on Natural Resources, U.S. House of Representatives, One Hundred Twelfth Congress, second session, Monday, June 4, 2012, in Phoenix, Arizona.
Published: (2013)
Published: (2013)
Providing for the allocation of net revenues of the Shoshone power plant of the Shoshone reclamation project in Wyoming.
Published: (1935)
Published: (1935)
Geologic map of the Growler Mountains, Pima and Maricopa Counties, Arizona /
Published: (1985)
Published: (1985)
Power plant entrainment : a biological assessment /
Published: (1978)
Published: (1978)
Water demand for steam electric generation ; an economic projection model /
by: Cootner, Paul H.
Published: (1965)
by: Cootner, Paul H.
Published: (1965)
Issue of Bonds by City of Phoenix, Ariz : hearings before the United States House Committee on the Territories, Sixty-First Congress, second session, on May 10, 1910.
Published: (1910)
Published: (1910)
Extension of Federal Power Act Deadline for Project in Ohio.
Published: (1996)
Published: (1996)
Extension of Federal Power Act Deadline for Project in Illinois.
Published: (1996)
Published: (1996)
Engineering feasibility and economic study for dual-purpose electric power-water desalting plant for Israel /
Published: (1966)
Published: (1966)
Amendment to Federal Water Power Act.
Published: (1921)
Published: (1921)
Power plant cooling water chlorination in northern California /
by: Hergott, S.
Published: (1978)
by: Hergott, S.
Published: (1978)
Fuel for growth : water and Arizona's urban environment /
by: Kupel, Douglas E. (Douglas Edward), 1956-
Published: (2003)
by: Kupel, Douglas E. (Douglas Edward), 1956-
Published: (2003)
Extension of Federal Power Act Deadline for Projects in North Carolina.
Published: (1996)
Published: (1996)
Feasibility study to determine the practicality of using potable municipal water supplies as a source of condenser cooling water for power generating facilities /
Published: (1980)
Published: (1980)
Extension of the Federal Power Act Deadline for Project Number 10228 in Kentucky.
Published: (1996)
Published: (1996)
Administration of justice within the Salt River Pima-Maricopa Indian Reservation : hearing before the Select Committee on Indian Affairs, United States Senate, Ninety-ninth Congress, second session on S. 2564 ... July 23, 1986, Washington, DC.
Published: (1986)
Published: (1986)
Letter from Acting Secretary of the Interior transmitting a report and findings on the feasibility of the installation of the Deer Creek power plant and appurtenant facilities as supplemental works to the Deer Creek division, Provo River project, Utah, pursuant to section 9 of the Reclamation Project Act of 1939.
Published: (1952)
Published: (1952)
Letter from the Secretary of the Interior, transmitting, in response to Senate Resolution No. 159, of January 27, 1910, information relative to water rights, power sites, etc., acquired on the public lands in Idaho.
Published: (1910)
Published: (1910)
Bonds Issued To Provide Facilities for Furnishing of Water.
Published: (1978)
Published: (1978)
Hydrogeology, water quality, and stormwater-sediment chemistry of the Grande Wash area, Fort McDowell Indian Reservation, Maricopa County, Arizona /
by: Hoffmann, John P.
Published: (2000)
by: Hoffmann, John P.
Published: (2000)
To Extend the Deadline Under the Federal Power Act Applicable to the Construction of FERC Project Number 3862 in the State of Iowa.
Published: (1997)
Published: (1997)
Missouri Basin Water and Power Supply Problems. Report of Sen. James E. Murray, Chairman, in Regard to Water Supply, Power Marketing Problems and Reservoir Management in the Missouri River Basin.
Published: (1960)
Published: (1960)
Assessing potential groundwater-level declines from future withdrawals in the Hualapai Valley, Northwestern Arizona /
by: Knight, Jacob E., et al.
Published: (2021)
by: Knight, Jacob E., et al.
Published: (2021)
[Development of Great Falls of Potomac for water power and increase of water supply for District of Columbia.].
Published: (1921)
Published: (1921)
Extension of Federal Power Act Deadline for Projects in Pennsylvania.
Published: (1996)
Published: (1996)
Water-powers of Canada /
Published: (1911)
Published: (1911)
Letter from the Secretary of War, transmitting report on the cost in detail and the economic value of developing power in the Potomac River.
Published: (1921)
Published: (1921)
Feasibility of diverting and detaining flood waters and urban storm runoff and the enhancement of ground-water recharge in the Tucson, area, Pima County, Arizona : executive summary /
Published: (1981)
Published: (1981)
Extension of Federal Power Act Deadline for Project Number 6641 in Kentucky.
Published: (1996)
Published: (1996)