Chandler Pumping Plant and Powerplant Operations at Prosser Diversion Dam, Washington.
| Corporate Authors: | United States. Congress. House. Committee on Resources, ProQuest (Firm) |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington :
[publisher not identified],
2000.
|
| Series: | United States congressional serial set.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Similar Items
Chandler Pumping Plant at Prosser Diversion Dam, Washington.
Published: (2000)
Published: (2000)
Chandler Pumping Plant and powerplant operations at Prosser Diversion Dam, Washington : report (to accompany H.R. 3986) (including cost estimate of the Congressional Budget Office).
Published: (2000)
Published: (2000)
Chandler Pumping Plant at Prosser Diversion Dam, Washington : report (to accompany S. 2163).
Published: (2000)
Published: (2000)
Changing the name of Roosevelt Dam, Reservoir, and Powerplant in Arizona to Theodore Roosevelt Dam, Lake, and Powerplant.
Published: (1959)
Published: (1959)
Third powerplant, Grand Coulee Dam.
Published: (1965)
Published: (1965)
Modeling water temperature in the Yakima River, Washington, from Roza Diversion Dam to Prosser Dam, 2005-06 /
by: Voss, Frank D.
Published: (2008)
by: Voss, Frank D.
Published: (2008)
Providing for the consideration of H.R. 3986, to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington : report (to accompany H. Res. 581).
Published: (2000)
Published: (2000)
Providing for the Consideration of H.R. 3986, To Provide for a Study of the Engineering Feasibility of a Water Exchange in Lieu of Electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington.
Published: (2000)
Published: (2000)
Third Powerplant, Columbia Basin Project, Washington : hearings before the United States House Committee on Interior and Insular Affairs, Subcommittee on Irrigation and Reclamation, Eighty-Ninth Congress, first session, on Sept. 9, 10, 1965.
Published: (1965)
Published: (1965)
Report of the Committee on Interior and Insular Affairs United States Senate together with separate and minority views to accompany S. 500 a bill to authorize the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects in the States of Arizona, Colorado, New Mexico, Utah, and Wyoming.
Published: (1955)
Published: (1955)
Modification of Buffalo Bill Dam, Wyoming.
Published: (1982)
Published: (1982)
Glacier Bay National Park Boundary Adjustment Act of 1996.
Published: (1996)
Published: (1996)
Fort Peck Reservation Rural Water System Act of 1999.
Published: (1999)
Published: (1999)
Colorado River storage project and participating projects.
Published: (1958)
Published: (1958)
Regarding the Use of the Trust Land and Resources of the Confederated Tribes of the Warm Springs Reservation of Oregon.
Published: (2001)
Published: (2001)
H.R. 3383, a Bill to Authorize the Secretary of the Interior to Construct, Operate, and Maintain the Colorado River Storage Project and Participating Projects, and for other Purposes. (Amendments Proposed by the Subcommittee on Irrigation and Reclamation).
Published: (1955)
Published: (1955)
Pump Repair, Southern Nevada Water Project, Nevada.
Published: (1982)
Published: (1982)
Fort Peck Reservation Rural Water System Act of 2000.
Published: (2000)
Published: (2000)
Fort Peck Reservation Rural Water System Act of 2000.
Published: (2000)
Published: (2000)
Subcommittee Amendments to H.R. 5118, a Bill to Authorize the Secretary of the Interior to Construct, Operate, and Maintain the Whitestone Coulee Unit of Okanogan-Similkameen Division, Chief Joseph Dam Project, Washington, and for other Purposes.
Published: (1964)
Published: (1964)
Designating the Kern River As a National Wild and Scenic River.
Published: (1987)
Published: (1987)
Amending the Wild and Scenic Rivers Act by Designating a Segment of the Lower Merced River in California As a Component of the National Wild and Scenic Rivers System.
Published: (1991)
Published: (1991)
Authorizing the Secretary of the Interior To Construct, Operate, and Maintain Hydroelectric Powerplants at Various Existing Water Projects.
Published: (1984)
Published: (1984)
Fryingpan-Arkansas project, Colorado.
Published: (1951)
Published: (1951)
Water Resources Activities in the U.S : Water Resources of Alaska.
Published: (1960)
Published: (1960)
Authorizing the Replacement of Existing Pump Casings in Southern Nevada Water Project Pumping Plants 1A and 2A.
Published: (1982)
Published: (1982)
Minot extension, Garrison diversion unit, Missouri River Basin project, North Dakota.
Published: (1970)
Published: (1970)
Authorizing the Secretary of the Interior To Construct, Operate, and Maintain an Enlarged Bumping Lake, Supplemental Storage Division, Yakima Project, Washington.
Published: (1980)
Published: (1980)
Third powerplant, Grand Coulee Dam, Columbia Basin project, Washington.
Published: (1966)
Published: (1966)
Selected Information on Proposed Snake River Reclamation Project, Including Hells Canyon Dam. Submitted by Department of the Interior.
Published: (1952)
Published: (1952)
South Dakota Water Supply and Assistance Act of 1988.
Published: (1988)
Published: (1988)
Reclamation Feasibility Studies 1975.
Published: (1975)
Published: (1975)
Manson Unit, Chief Joseph Dam Project, Washington : hearings before the United States House Committee on Interior and Insular Affairs, Subcommittee on Irrigation and Reclamation, Eighty-Ninth Congress, first session, on July 29, 1965.
Published: (1965)
Published: (1965)
Subcommittee Amendments to H.R. 2411, a Bill to Authorize the Secretary of the Interior to Construct, Operate, and Maintain the Auburn-Folsom South Unit, American River Diversion, Central Valley Project, California, under Federal Reclamation Laws.
Published: (1964)
Published: (1964)
Letter from Assistant Secretary of the Interior transmitting a report on the Burns Creek Dam, powerplant, and reservoir, Palisades project, Idaho, pursuant to the provisions of section 9 (a) of the Reclamation Project Act of 1939 (53 Stat. 1187).
Published: (1957)
Published: (1957)
[Estimate to improve electric-light plant of Interior Department.].
Published: (1913)
Published: (1913)
Authorizing the Secretary of the Interior to construct, operate, and maintain the Colorado River storage project and participating projects.
Published: (1954)
Published: (1954)
H.R. 412, a Bill to Authorize the Construction, Operation and Maintenance by the Secretary of the Interior of the Fryingpan-Arkansas Project, Colorado. Amendments Proposed by the Subcommittee on Irrigation and Reclamation.
Published: (1956)
Published: (1956)
Thomas Prosser.
Published: (1907)
Published: (1907)
John Prosser.
Published: (1937)
Published: (1937)