Re-issue of P08-08 : precautions for the use of the Analysis of Retreat Mining Pillar Stability (ARMPS) computer program.
| Corporate Author: | United States. Mine Safety and Health Administration |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
[Arlington, Va.] :
[U.S. Dept. of Labor, Mine Safety and Health Administration],
[2010]
|
| Series: | Program information bulletin ;
no. P 10-23. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo11181 |
Similar Items
Analysis of Retreat Mining Pillar Stability (ARMPS) : version 4.0 for Windows.
Published: (1997)
Published: (1997)
ARMPS-HWM : new software for sizing pillars for highwall mining.
Published: (2006)
Published: (2006)
Room and pillar retreat mining : a manual for the coal industry /
by: Kauffman, Peter W.
Published: (1981)
by: Kauffman, Peter W.
Published: (1981)
Proceedings of the Second International Workshop on Coal Pillar Mechanics and Design /
Published: (1999)
Published: (1999)
Reissue of P08-03 : use of stabilizers (outriggers) on chassis-mounted drills and cranes.
Published: (2011)
Published: (2011)
Re-issue of P08-13 : use of single-boom roof bolting machines.
Published: (2011)
Published: (2011)
Reissue of P05-19 : use of mobile roof support (MRS) units for retreat mining.
Published: (2011)
Published: (2011)
Reissue of P08-15 : fire suppression systems used to protect battery charging stations and other unattended electrically powered equipment in underground coal mines.
Published: (2011)
Published: (2011)
Proceedings, new technology for ground control in multiple-seam mining /
Published: (2007)
Published: (2007)
Reissue of P08-16 : clarification of procedures to use when reporting Self-Contained Self-Rescuer (SCSR) inventories.
Published: (2011)
Published: (2011)
Pillar recovery design, technologies, and procedures in roof control plan reviews.
Published: (2012)
Published: (2012)
Stereographic method of determining whether planes of weakness transect pillars /
by: Touseull, Jack A.
Published: (1977)
by: Touseull, Jack A.
Published: (1977)
Proceedings of the second international workshop on coal pillar mechanics and design, Information Circular (IC) 9448.
Published: (2001)
Published: (2001)
Re-issue of P09-23 : underground scoop accidents.
Published: (2011)
Published: (2011)
Geomechanical aspects of abandoned room and pillar mines and remediation measures /
by: Aydan, Ă–mer
Published: (2025)
by: Aydan, Ă–mer
Published: (2025)
Analysis of pillar stability on steeply pitching seam using the finite element method /
by: Kripakov, Nicholas P.
Published: (1981)
by: Kripakov, Nicholas P.
Published: (1981)
Re-issue P08-02 : reporting deaths on mine property.
Published: (2011)
Published: (2011)
Re-issue P01-05 : reporting "sampling start time" on redesigned dust data card.
Published: (2010)
Published: (2010)
A case history of a major rock burst /
by: Leighton, Fred
Published: (1982)
by: Leighton, Fred
Published: (1982)
Re-issue of P09-35 : continuous mining machines safety features (main machine circuit-interrupting device, remote traction motor circuit breaker reset, e-stop override, methane monitor failure override.
Published: (2011)
Published: (2011)
Re-issue of P05-05 : use of magnets near remote control operated equipment.
Published: (2009)
Published: (2009)
Reissue of P09-V-08, procedures for revoking MSHA certifications to take respirable dust samples or to maintain and calibrate approved dust sampling devices.
Published: (2012)
Published: (2012)
Re-issue of P09-02 : filing of ground control plans for surface coal mines.
Published: (2011)
Published: (2011)
Re-issue of P09-32 : Safe design or retrofit for safely resetting the main disconnect on battery-powered scoops in underground mines.
Published: (2011)
Published: (2011)
Re-issue of P07-31 : use of fall protection in, around, or over any shaft and conveyance safety measures.
Published: (2011)
Published: (2011)
Re-issue of P09-30 : Short circuit protection for trailing cables longer than 500 feet.
Published: (2011)
Published: (2011)
Re-issue P01-06 : diesel particulate matter in underground coal mines--training program guide.
Published: (2010)
Published: (2010)
Re-issue of P07-12 : best practices for turning crosscuts with remote controlled continuous mining machines.
Published: (2011)
Published: (2011)
Re-issue of P04-15 : transmission of respirable dust samples by mine operators and correction of dust data card information.
Published: (2011)
Published: (2011)
Reissue of P08-12 : technologically achievable, administratively achievable, and promising noise controls (30 C.F.R. Part 62).
Published: (2011)
Published: (2011)
Re-issue of P07-20 : change to respirable dust data card-addition of pre-weight date.
Published: (2011)
Published: (2011)
Re-issue of P01-04 : hoist examination and safety test requirements.
Published: (2008)
Published: (2008)
Re-issue of P 03-13 : trailing cable overheating on equipment cable reels.
Published: (2011)
Published: (2011)
Re-issue of P09-02 : application of 30 C.F.R. SS 77.405(b), 56.14211, 57.14211, 56.14105, and 57.14105 to dragline masts.
Published: (2011)
Published: (2011)
Re-issue of P09-41 : voluntary program to evaluate new or novel fire suppression agents and devices used for manual fire fighting purposes.
Published: (2011)
Published: (2011)
Re-issue of P09-26 : potential hazard to roof bolting machine operators due to inadvertent control actuation.
Published: (2011)
Published: (2011)
Re-issue of P09-15 : potential safety hazard related to explosion of pumps.
Published: (2011)
Published: (2011)
An Analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining /
by: Pytel, W. M.
Published: (1990)
by: Pytel, W. M.
Published: (1990)
Toward safer underground coal mines /
Published: (1982)
Published: (1982)
Reissue of P07-15 : potential safety hazard on permissible mobile diesel-powered transportation equipment with Sandvik (formerly EJC Mining Equipment, Inc.) wet scrubber systems.
Published: (2011)
Published: (2011)