Non-vital bus fault leads to fire and loss of offsite power.
| Corporate Author: | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington, D.C. :
U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
[2000]
|
| Series: | NRC information notice ;
2000-14. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/LPS126507 |
Similar Items
Loss of a safety-related motor control center caused by a bus fault.
Published: (2008)
Published: (2008)
Switchgear fire and partial loss of offsite power at Waterford Generating Station, Unit 3.
Published: (1995)
Published: (1995)
Operational experience on bus transfers.
Published: (1991)
Published: (1991)
Metalclad switchgear failures and consequent losses of offsite power.
Published: (2002)
Published: (2002)
Loss of offsite power caused by problems in fiber optics systems.
Published: (1986)
Published: (1986)
Loss of offsite power upon an automatic bus transfer.
Published: (1986)
Published: (1986)
Results of Hemyc electrical raceway fire barrier system full scale fire testing.
Published: (2005)
Published: (2005)
Evaluation of suppression methods for electrical cable fires /
by: Chavez, J. M.
Published: (1986)
by: Chavez, J. M.
Published: (1986)
Loss of offsite power to vital-buses at Salem 2.
Published: (1986)
Published: (1986)
Excessive cooldown and depressurization of the reactor coolant system following a loss of offsite power.
Published: (1995)
Published: (1995)
Inadequate offsite power system voltages during design-basis events.
Published: (1995)
Published: (1995)
Grid reliability and the impact on plant risk and the operability of offsite power.
Published: (2006)
Published: (2006)
Safety system response to loss of coolant and loss of offsite power.
Published: (1993)
Published: (1993)
Thermal behaviour of electrical conductors : steady, dynamic, and fault-current ratings /
by: Morgan, Vincent T. (Vincent Thomas), 1923-
Published: (1991)
by: Morgan, Vincent T. (Vincent Thomas), 1923-
Published: (1991)
Switchyard problems that contribute to loss of offsite power.
Published: (1991)
Published: (1991)
Loss of vital AC power with subsequent reactor coolant system heat-up.
Published: (1990)
Published: (1990)
Single-failure and fire vunerability of redundant electrical safety buses.
Published: (2005)
Published: (2005)
Problems associated with post-fire safe-shutdown circuit analyses.
Published: (1999)
Published: (1999)
Partial loss of non-nuclear instrument system power supply during operation.
Published: (1980)
Published: (1980)
Requirements for establishing detector siting criteria in fires involving electrical materials.
by: Boccio, J. L.
Published: (1982)
by: Boccio, J. L.
Published: (1982)
Improper electrical grounding results in simultaneous fires in the control room and safe-shutdown equipment room.
Published: (1997)
Published: (1997)
Potential for common-mode failure of standby gas treatment system on loss of off-site power.
Published: (1985)
Published: (1985)
Potential failures of Westinghouse Electric Corporation type SA-1 differential relays.
Published: (1983)
Published: (1983)
Evaluation of fire models for nuclear power plant applications, cable tray fires : international panel report /
Published: (2002)
Published: (2002)
Joint a̲ssessment of c̲able damage and q̲uantification of e̲ffects from fi̲r̲e̲ (JACQUE-FIRE) : final report.
Published: (2012)
Published: (2012)
A computer code for fire protection and risk analysis of nuclear plants /
by: Singhal, A. K., et al.
Published: (1988)
by: Singhal, A. K., et al.
Published: (1988)
Potential failure of fire water supply pumps to automatically start due to a fire.
Published: (2009)
Published: (2009)
Electrical fault and fire prevention and protection.
Published: (1991)
Published: (1991)
Potential problems with fire barrier penetration seals.
Published: (1997)
Published: (1997)
Potentially nonconforming Hemyc and MT fire barrier configurations.
Published: (2006)
Published: (2006)
Potential loss of safe shutdown equipment due to premature silicon controlled rectifier failure.
Published: (1988)
Published: (1988)
Potential for loss of remote shutdown capability during a control room fire.
Published: (1992)
Published: (1992)
Erroneous data from defective thermocouple results in a fire.
Published: (1996)
Published: (1996)
Fire dynamics tools (FDTs) quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission fire protection inspection program : supplement 1 /
by: Stroup, D., et al.
Published: (2012)
by: Stroup, D., et al.
Published: (2012)
Isolation transfer switches and post-fire shutdown capability.
Published: (1985)
Published: (1985)
Deficiencies found in thermo-lag fire barrier installation.
Published: (1991)
Published: (1991)
Loss of offsite power and dual-unit trip at Catawba Nuclear Generating Station.
Published: (2007)
Published: (2007)
Sustained degraded voltage on the offsite electrical grid and loss of other generating stations as a result of a plant trip.
Published: (1989)
Published: (1989)
Inaccessible or underground power cable failures that disable accident mitigation systems or cause plant transients.
Published: (2007)
Published: (2007)
Update of failure of automatic sprinkler system valves to operate.
Published: (1986)
Published: (1986)