Potential for data collection equipment to affect protection system performance.
| Corporate Author: | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington, D.C. :
U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
[1995]
|
| Series: | NRC information notice ;
95-13. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo4126 |
Similar Items
Implementing digital instrumentation and control systems in the modernization of nuclear power plants.
Published: (2009)
Published: (2009)
Electrical distrribution system failures affecting security equipment.
Published: (2005)
Published: (2005)
Electrical distribution systems failures affecting security equipment.
Published: (2005)
Published: (2005)
Instrument air supply system problems affecting safety-related equipment.
Published: (1988)
Published: (1988)
Manual initiation of protective actions.
Published: (2010)
Published: (2010)
Automated data collection for determining statistical distributions of module power undergoing potential-induced degradation : preprint /
by: Hacke, Peter, et al.
Published: (2014)
by: Hacke, Peter, et al.
Published: (2014)
Isolation between signals of the protection system and non-safety-related equipment.
Published: (1984)
Published: (1984)
Enclosure of vital equipment within designated vital areas.
Published: (1987)
Published: (1987)
Engineering safety aspects of the protection of nuclear power plants against sabotage.
Published: (2007)
Published: (2007)
On-line monitoring for improving performance of nuclear power plants.
Published: (2008)
Published: (2008)
On-line monitoring for improving performance of nuclear power plants.
Published: (2008)
Published: (2008)
Temporary suspension of e-quip system to affect pending background investigations.
Published: (2015)
Published: (2015)
Specification and selection of data logging equipment.
Published: (1968)
Published: (1968)
Capacitor failures in Westinghouse Eagle 21 plant protection systems.
Published: (1994)
Published: (1994)
INL's SCADA test bed : helping protect the nation's supervisory control and data acquisition systems.
Published: (2005)
Published: (2005)
Data reduction system utilizing Golden River counting and recording equipment /
by: Lee, Jae Y.
Published: (1983)
by: Lee, Jae Y.
Published: (1983)
Temporary scaffolding affects operability of safety-related equipment.
Published: (2007)
Published: (2007)
Data acquisition systems /
by: VanDoren, Arnold H.
Published: (1982)
by: VanDoren, Arnold H.
Published: (1982)
Preparing and conducting review missions of instrumentation and control systems in nuclear power plants.
Published: (2011)
Published: (2011)
Cyber security and safety of nuclear power plant instrumentation and control systems /
Published: (2020)
Published: (2020)
Operational response to events concerning deliberate acts directed against plant equipment.
Published: (1983)
Published: (1983)
Explosives searches at protected area portals.
Published: (1991)
Published: (1991)
Data acquisition systems : from fundamentals to applied design /
by: Di Paolo Emilio, Maurizio
Published: (2013)
by: Di Paolo Emilio, Maurizio
Published: (2013)
Unauthorized forced entry into the protected area at Three Mile Island Unit 1 on February 7, 1993.
Published: (1993)
Published: (1993)
An automated system for accumulating count recorder (ACR) field data collection /
by: Li, Shifeng
Published: (1994)
by: Li, Shifeng
Published: (1994)
Emergency response data system.
Published: (1989)
Published: (1989)
Planning of automated data acquisition and process control systems (ADACS) /
by: Multer, Roger H.
Published: (1980)
by: Multer, Roger H.
Published: (1980)
Intrusion detection systems handbook.
Published: (1977)
Published: (1977)
Draft Regulatory Guide DG-1149 : qualification of safety-related motor control centers for nuclear power plants.
Published: (2008)
Published: (2008)
Secure network design /
by: Michalski, John T.
Published: (2012)
by: Michalski, John T.
Published: (2012)
Failures of air-operated valves affecting safety-related systems.
Published: (1988)
Published: (1988)
Generic problems with ASCO valves in nuclear applications including fire protection systems.
Published: (1980)
Published: (1980)
Potential misassembly problem with Automatic Switch Company (ASCO) solenoid valve model NP 8316.
Published: (1983)
Published: (1983)
Compensatory measures for prolonged periods of security system failures.
Published: (1986)
Published: (1986)
Revised protection action guidance for nuclear incidents.
Published: (1992)
Published: (1992)
Protected area long-term housekeeping.
Published: (1989)
Published: (1989)
The interface between safety and security at nuclear power plants /
Published: (2010)
Published: (2010)
Impact of security practices on safe operations.
Published: (1983)
Published: (1983)
Long-term wind power variability /
by: Wan, Yih-huei
Published: (2012)
by: Wan, Yih-huei
Published: (2012)
Equipment Qualification for Nuclear Installations.
by: IAEA
Published: (2021)
by: IAEA
Published: (2021)