Description
Abstract:This report describes the second and final year activities of the project titled "Using Operations-Oriented Performance Measures to Support Freeway Management Systems." Work activities included developing a prototype system architecture for testing the use of performance measures in real-time. Outputs from this effort included operator's screens, a prototype database, and a concept of operations for using the real-time measures. Additional work showcased the application of a multi-criterion screening approach to the selection of competing performance measures.
Item Description:Title from PDF title screen (October 23, 2009).
"February 2008; Published: December 2008."
"Report number FHWA/TX-08/0-5292-2"--Technical report documentation p.
Electronic resource.
Physical Description:x, 88 pages : digital, PDF file (3.79 MB) with illustrations
Format:Mode of access: World Wide Web.
Bibliography:Includes bibliographical references (pages 75-76).