| Tag |
First Indicator |
Second Indicator |
Subfields |
| LEADER |
00000cam a2200000 a 4500 |
| 001 |
in00002326331 |
| 005 |
20211129153257.0 |
| 008 |
070904s2007 dcuab f000 0 eng c |
| 020 |
|
|
|a 9780160791109
|
| 020 |
|
|
|a 0160791103
|
| 035 |
|
|
|a (OCoLC)ocn163566456
|
| 037 |
|
|
|a 552-070-36207-0
|b GPO
|
| 040 |
|
|
|a GPO
|c GPO
|d MvI
|d UtOrBLW
|
| 042 |
|
|
|a pcc
|
| 043 |
|
|
|a n-us---
|
| 049 |
|
|
|a UDOC
|
| 049 |
|
|
|a WWW
|
| 050 |
1 |
4 |
|a KF27
|b .G654 2006g
|
| 074 |
|
|
|a 1016-A
|
| 074 |
|
|
|a 1016-A (online)
|
| 074 |
|
|
|a 1016-B (MF)
|
| 074 |
|
|
|a 1016-B (online)
|
| 086 |
0 |
|
|a Y 4.G 74/7:EL 2/20
|
| 088 |
|
|
|a Serial no. 109-229 (United States. Congress. House. Committee on Government Reform)
|
| 110 |
1 |
|
|a United States.
|b Congress.
|b House.
|b Committee on Government Reform.
|b Subcommittee on Energy and Resources.
|
| 245 |
1 |
0 |
|a Can the U.S. electric grid take another hot summer? :
|b hearing before the Subcommittee on Energy and Resources of the Committee on Government Reform, House of Representatives, One Hundred Ninth Congress, second session, July 12, 2006.
|
| 246 |
3 |
|
|a Can the US electric grid take another hot summer?
|
| 264 |
|
1 |
|a Washington :
|b U.S. G.P.O. :
|c 2007.
|
| 264 |
|
2 |
|a Washington :
|b For sale by the Supt. of Docs., U.S. G.P.O.,
|
| 300 |
|
|
|a iii, 232 pages :
|b illustrations, maps ;
|c 24 cm.
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a unmediated
|b n
|2 rdamedia
|
| 338 |
|
|
|a volume
|b nc
|2 rdacarrier
|
| 500 |
|
|
|a Distributed to some depository libraries in microfiche.
|
| 500 |
|
|
|a "Serial number 109-229."
|
| 500 |
|
|
|a Shipping list number: 2007-0361-P.
|
| 500 |
|
|
|a Shipping List Date: 08/27/2007
|
| 530 |
|
|
|a Also available via Internet from the GPO Access web site. Address as of 8/8/07: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=109%5Fhouse%5Fhearings&docid=f:34544.pdf; current access available via PURL.
|
| 650 |
|
0 |
|a Electric power distribution
|z United States.
|
| 650 |
|
0 |
|a Electric power failures
|z United States
|x Prevention.
|
| 650 |
|
0 |
|a Electric utilities
|x Industrial capacity
|z United States.
|
| 856 |
4 |
1 |
|u https://purl.fdlp.gov/GPO/LPS84443
|t 0
|
| 999 |
|
|
|a MARS
|
| 999 |
f |
f |
|s 7fe400ea-c8a2-3bfc-ae0a-ce6496ded39b
|i 81c9db3f-8781-3893-85c4-dca06985222c
|t 0
|
| 952 |
f |
f |
|a Texas A&M University
|b College Station
|c Electronic Resources
|d Available Online
|t 0
|e Y 4.G 74/7:EL 2/20
|h Superintendent of Documents classification
|
| 998 |
f |
f |
|a Y 4.G 74/7:EL 2/20
|t 0
|l Available Online
|