Optimal Resource Adjustment Times in product development project /
Improving project schedule performance is critical to project success in many industries. Resource allocation has been used as a tool for improving project schedule performance. Common resource allocation policies allocate the same fraction of available resources to each activity as the fraction of...
| Main Author: | Lee, Zee Woon 1975- |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
2004.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Similar Items
Optimal owner contractor relationships based on capital project competencies /
by: Patil, Shekhar Suresh, 1968-
Published: (2000)
by: Patil, Shekhar Suresh, 1968-
Published: (2000)
Development of genetic algorithm-based signal optimization program for oversaturated intersections /
by: Park, Byungkyu
Published: (1998)
by: Park, Byungkyu
Published: (1998)
An optimization-simulation model for real time operation of a multireservoir water supply system /
by: Ibanez-Castillo, Laura Alicia, 1964-
Published: (1997)
by: Ibanez-Castillo, Laura Alicia, 1964-
Published: (1997)
Utilizing optimization in municipal stormwater management /
by: Dorman, Stephen Paul, 1971-
Published: (1995)
by: Dorman, Stephen Paul, 1971-
Published: (1995)
Computer optimization of earthmoving equipment arrays.
by: Pate, Jep Earl
Published: (1971)
by: Pate, Jep Earl
Published: (1971)
The capacity of suction caisson in isotropic and anisotropic cohesive soils under general loading conditions /
by: Han, Seung-Woon, 1971-
Published: (2002)
by: Han, Seung-Woon, 1971-
Published: (2002)
Methodology for the rapid study of water resources development alternatives.
by: Rahman, Khandaker Mohammad Abdur
Published: (1974)
by: Rahman, Khandaker Mohammad Abdur
Published: (1974)
Signal Timing Optimization to Improve Air Quality /
by: Lv, Jinpeng
Published: (2013)
by: Lv, Jinpeng
Published: (2013)
Development of optimization models for signalized intersections during oversaturated conditions /
by: Kim, Youngchan, 1961-
Published: (1990)
by: Kim, Youngchan, 1961-
Published: (1990)
Reservoir analysis using production decline data and adjusted time /
by: McCray, Thomas Lee, 1965-
Published: (1990)
by: McCray, Thomas Lee, 1965-
Published: (1990)
Project scheduling using fuzzy PERT and risk management /
by: Yoo, Wi Sung, 1975-
Published: (2003)
by: Yoo, Wi Sung, 1975-
Published: (2003)
The development of a methodology to quantify the impacts of information management strategies on EPC projects /
by: Moreau, Karen Anne
Published: (1997)
by: Moreau, Karen Anne
Published: (1997)
Critical assessment of the features of two ramp metering optimization models /
by: Park, Eunmi, 1963-
Published: (1993)
by: Park, Eunmi, 1963-
Published: (1993)
Optimization methodology for the calibration of transportation network micro-simulation models /
by: Kim, Kyu-Ok
Published: (2002)
by: Kim, Kyu-Ok
Published: (2002)
Automated and Optimized Project Scheduling Using BIM /
by: Faghihi, Vahid
Published: (2015)
by: Faghihi, Vahid
Published: (2015)
Activity-based costing simulation as a tool for construction process optimization /
by: Son, Junghye
Published: (1999)
by: Son, Junghye
Published: (1999)
Methodology for selecting project delivery and contract strategies for capital projects /
by: Oyetunji, Adetokunbo Adegboyega
Published: (2001)
by: Oyetunji, Adetokunbo Adegboyega
Published: (2001)
Microbial petroleum degradation enhancement by oil spill bioremediation products /
by: Lee, Salvador Aldrett, 1971-
Published: (1996)
by: Lee, Salvador Aldrett, 1971-
Published: (1996)
An evaluation of inductance loop detector lead length and optimal speed trap distance /
by: Hamm, Robert Alan
Published: (1994)
by: Hamm, Robert Alan
Published: (1994)
An analytical study of rail grinding optimization for rail-head fatigue defect prevention /
by: Jones, Scott Laurence
Published: (1997)
by: Jones, Scott Laurence
Published: (1997)
Development of an actuated traffic control process utilizing real-time estimated volume feedbback /
by: Pacelli, Michael Joseph
Published: (1999)
by: Pacelli, Michael Joseph
Published: (1999)
A comparison of trip production rates developed from two types of travel survey diaries /
by: Tyner, Fred Mack
Published: (1996)
by: Tyner, Fred Mack
Published: (1996)
Integration of Total Quality Management with a project management approach for capital projects /
by: Cook, Ellis Lynn, 1951-
Published: (1997)
by: Cook, Ellis Lynn, 1951-
Published: (1997)
Optimizing detector placement for isolated intersections based on minimizing average delay and number of stops /
by: Hoppers, Kevin Paul
Published: (2000)
by: Hoppers, Kevin Paul
Published: (2000)
A computer solution to assist in estimating and optimizing the duration and cost of operations for earthmoving systems.
by: Smith, James Charles
Published: (1970)
by: Smith, James Charles
Published: (1970)
An interpretation of information gained from residence time distribution studies for operation of biological reactors.
by: Dodge, Marlow Lee
Published: (1971)
by: Dodge, Marlow Lee
Published: (1971)
Optimizing detector placement for high speed isolated signalized intersections using vehicular delay as the criterion /
by: Koniki, Lakshmi Manasa
Published: (1994)
by: Koniki, Lakshmi Manasa
Published: (1994)
Identification of research and development needs in highway construction engineering and management /
by: Damron, Andrew James, 1975-
Published: (2001)
by: Damron, Andrew James, 1975-
Published: (2001)
The economic impacts of highway widening projects /
by: Jackson, Patricia Ann, 1966-
Published: (1997)
by: Jackson, Patricia Ann, 1966-
Published: (1997)
Construction project delay-analysis techniques /
by: Al-Humaidi, Hanouf M.
Published: (2002)
by: Al-Humaidi, Hanouf M.
Published: (2002)
Optimal control of projects based on Kalman Filter approach for tracking and forecasting the project performance /
by: Bondugula, Srikant
Published: (2010)
by: Bondugula, Srikant
Published: (2010)
Oil spill response resources /
by: Muthukrishnan, Shankar
Published: (1996)
by: Muthukrishnan, Shankar
Published: (1996)
The flood control project of San Felipe Arroyo.
by: Nixon, Sam Ab
Published: (1937)
by: Nixon, Sam Ab
Published: (1937)
Space-time streamflow : a theoretical and practical approach /
by: Wang, Chengming, 1967-
Published: (2002)
by: Wang, Chengming, 1967-
Published: (2002)
Development of a research methodology to study lumber waste due to design causes in residential construction /
by: Vyas, Ashok Madhusudan, 1975-
Published: (1999)
by: Vyas, Ashok Madhusudan, 1975-
Published: (1999)
Development of statistical wet weather model to evaluate frictional properties at the pavement-tire interface on hot mix asphalt concrete /
by: Bedi, Harpreet, 1975-
Published: (2001)
by: Bedi, Harpreet, 1975-
Published: (2001)
The optimal location of a booster pump in a pipe network with correlated studies of convergence properties of water distribution systems.
by: Williams, Glen Nordyke
Published: (1965)
by: Williams, Glen Nordyke
Published: (1965)
Integrated range estimating and probabilistic scheduling of construction projects /
by: Isidore, Leroy James
Published: (1999)
by: Isidore, Leroy James
Published: (1999)
The integration of economic and environmental factors in project feasibility planning /
by: Clarke, Gordon Mitchell, 1939-
Published: (1995)
by: Clarke, Gordon Mitchell, 1939-
Published: (1995)
Institutional considerations in reallocation and transfer of water resources /
by: Thaman, Bill Joseph, 1963-
Published: (1994)
by: Thaman, Bill Joseph, 1963-
Published: (1994)