Providing for the consideration of H.R. 3986, to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington : report (to accompany H. Res. 581).

Bibliographic Details
Corporate Author: United States. Congress. House. Committee on Rules
Format: Government Document Book
Language:English
Published: [Washington, D.C.] : [U.S. G.P.O.], [2000]
Series:Report / 106th Congress, 2d session, House of Representatives ; 106-866
Subjects:
Online Access:Text version:
Adobe Acrobat Reader required
Description
Item Description:Caption title.
Distributed to some depository libraries in microfiche.
Shipping list number: 2001-0017-P.
"September 19, 2000."
Shipping List #: 2001-0017-P
Shipping List Date: 10/24/2000
Physical Description:1 unnumbered leaf ; 24 cm.
Also available via Internet from the G.P.O. Access web site. Addresses as of 11/22/00: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=106c̲ongr̲eports&docid=f:hr866.106 (text version), http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=106c̲ongr̲eports&docid=f:hr866.106.pdf (PDF version); current access is available via PURLs.