Multi-parameter bidding method : development of parameters /
5) administrative and legal elements. The integrated
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1998.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
| Summary: | 5) administrative and legal elements. The integrated and 5) proposing an outline for an integrated approach to approach to multi-parameter bidding explores the relationship between various other processes and the process for selecting bid system; 2) impact on SHA resources; 3) impact on product construction industry. The major objective of this research current practices; 3) synthesizing literature and survey currently practiced by State Highway Agencies (SHA). The currently used parameters; 4) evaluating these parameters; goal is to make this type of bidding more effective in terms is to further develop the multi-parameter bidding method as ment framework. Preliminary implementation guidelines are multi-parameter bidding for application in the highway multi-parameter bidding strategy within the project develop multi-parameter bidding. The parameters were evaluated in objectives. The major tasks involved in @s investigation of cost, schedule, quality, safety, and other project provided as part of this integrated approach. quality; 4) nature, magnitude, and allocation of risks, and results to propose new parameters and innovative use of review; 2) surveying the highway construction industry for terms of a number of major criteria: 1) compatibility to low- This thesis presents the results of an investigation of were: 1) determining state-of-the-art through literature |
|---|---|
| Item Description: | "Major subject: Civil Engineering". Vita. |
| Physical Description: | x, 264 leaves : illustrations ; 28 cm. Also available online. Issued also on microfiche from Lange Micrographics. |
| Bibliography: | Includes bibliographical references: pages 150-153. |