Cost and production estimation for a cutter suction dredge /
are some non-proprietary production programs. However,
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1997.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
| Summary: | are some non-proprietary production programs. However, available to the general public. This report discusses been given to the program, which stands for Cutter capability of personal computers to manipulate large amounts centrifugal pump theory are incorporated into the completion, an accurate estimate of the final cost is cost estimate results produced by CSDCEP were compared cost is through the use of a computer program, based on the cost. detailing the operation of the program is available. The Development of such a program requires both theoretical and efficiently execute a project from its conception to its estimation program. Both slurry transport theory and estimation programs in use in the dredging industry formatand may be used in conjunction with Microsoft imperative. The most practical method of determining the is applied in the cost estimation component. The gram is written in the Quattropro(version6.01)spread sheet knowledge of costs associated with the dredging process need exists for a program of this type which can be made of a great deal of data for a specific dredge. Practical of data and perform difficult calculations without error. one completed projects. The average difference between percent. CSDCEP is a generalized cost estimating program practical knowledge of the dredging process. production component of the program. This is necessary production have been developed over the years, and there programs are proprietary and therefore not available to that yields a good approximation of the final dredging the development of a new generalized cost and production the dredging industry. In order for a dredging contractor to the estimate and the actual costs was twenty four the majority of both cost and production estimation The need for accurate cost estimates is well recognized in There are several existing cost estimation and production those apart from the individual company. Therefore, the to obtain an accurate production estimate in the absence today. Several different algorithms to estimate Windows version 3.1 or Windows95. The acronym CSDCEP has with actual data and government cost estimates for twenty |
|---|---|
| Item Description: | "Major subject: Ocean Engineering". Vita. |
| Physical Description: | ix, 101 leaves : illustrations ; 28 cm. Also available online. Issued also on microfiche from Lange Micrographics. |
| Bibliography: | Includes bibliographical references: pages 58-59. |