Integrated production and maintenance scheduling /
can be utilized to make more informed decisions about the
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1996.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
| Summary: | can be utilized to make more informed decisions about the cases. Two special cases of the multiple job problem are developed for the single job case and the constant rate developed for the varying rate modifier case. Experimental for a discrete manufacturing environment is the focus of this has become more readily available. This on-line information information, such as quality or rate of the assembly process, integrated maintenance and production scheduling problem on a modifier case. Further, a branch-and-bound procedure is nominal working conditions after drifting out of control, is procedure can be used to solve problems of realistic size in production and maintenance scheduling problem. The reasonable time. single machine is formulated for the single and multiple job solutions at most 0.3% from optimality. The branch-and-bound studied. Optimal solution polynomial-time algorithms are studies suggest that the heuristics developed produce The integrated maintenance and production scheduling problem the type of maintenance being scheduled in this study. The topic was motivated by the electronic assembly industry. With increased automation of the assembly process, on-line work. Corrective maintenance, which returns a machine to |
|---|---|
| Item Description: | "Major subject: Industrial Engineering". Vita. |
| Physical Description: | ix, 92 leaves : illustrations ; 28 cm. Also available online. Issued also on microfiche from Lange Micrographics. |
| Bibliography: | Includes bibliographical references: pages 88-89. |