p chart control limits based on a small number of subgroups /

a production run. This thesis offers a solution to this

Bibliographic Details
Main Author: Nedumaran, Gunabushanam
Format: Thesis eBook
Language:English
Published: [Place of publication not identified] : [publisher not identified] ; 1994.
Subjects:
Online Access:Link to OAKTrust copy
Description
Summary:a production run. This thesis offers a solution to this
at least 20 subgroups for setting up valid control limits,
charts in short run situations and during the early stages of
issue by proposing a method for setting up p chart control
limits even when the data available is from only a small
methods, while increasing the rate of false alarms by only a
number of subgroups. The run length performance of the
other methods. The applicability of these methods to a short
process fraction nonconforming more often than the other two
proposed method has been experimentally compared with two
proposed method has been found to detect shifts in the
run situation has also been assessed experimentally. The
small amount.
The classical Shewhart p chart procedure requires data from
unknown. This data requirement has prevented the use of p
when the true fraction nonconforming of the process is
Item Description:"Major subject: Industrial Engineering".
Vita.
Physical Description:viii, 57 leaves : illustrations ; 28 cm.
Also available online.
Bibliography:Includes bibliographical references.