APA (7th ed.) Citation

Flint and Neill Partnership. (1986). Interim design standard: Long span bridge loading. Bridges Division, Highways and Structures Dept., Transport and Road Research Laboratory.

Chicago Style (17th ed.) Citation

Flint and Neill Partnership. Interim Design Standard: Long Span Bridge Loading. Crowthorne, Berkshire: Bridges Division, Highways and Structures Dept., Transport and Road Research Laboratory, 1986.

MLA (9th ed.) Citation

Flint and Neill Partnership. Interim Design Standard: Long Span Bridge Loading. Bridges Division, Highways and Structures Dept., Transport and Road Research Laboratory, 1986.

Warning: These citations may not always be 100% accurate.