| Tag |
First Indicator |
Second Indicator |
Subfields |
| LEADER |
00000cam a2200000 i 4500 |
| 001 |
in00000798404 |
| 005 |
20151017083405.0 |
| 008 |
780620s1978 dcua b f00010 eng d |
| 010 |
|
|
|a gp 78018613
|
| 020 |
|
|
|c pbk.
|
| 035 |
|
|
|a (OCoLC)03990617
|
| 035 |
|
|
|9 ADR7373AM
|
| 037 |
|
|
|b 20590
|
| 040 |
|
|
|c GPO
|d UtOrBLW
|
| 074 |
|
|
|a 982-G-19
|
| 086 |
|
|
|a TD 2.30/4:78-216
|
| 100 |
1 |
|
|a Beeson, Douglas H.
|
| 245 |
1 |
0 |
|a Integration of maintenance needs into preconstruction procedures /
|c prepared by Douglas H. Beeson.
|
| 264 |
|
1 |
|a Washington :
|b Dept. of Transportation, Federal Highway Administration, Offices of Research and Development, Implementation Division,
|c 1978.
|
| 300 |
|
|
|a iv, 153 pages :
|b illustrations ;
|c 28 cm.
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a unmediated
|b n
|2 rdamedia
|
| 338 |
|
|
|a volume
|b nc
|2 rdacarrier
|
| 490 |
1 |
|
|a Report - Federal Highway Administration ; FHWA-TS-78-216
|
| 500 |
|
|
|a Final report; April 1978.
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 650 |
|
0 |
|a Roads
|x Design and construction.
|
| 650 |
|
0 |
|a Roads
|x Maintenance and repair.
|
| 650 |
|
0 |
|a Highway planning.
|
| 710 |
1 |
|
|a United States.
|b Federal Highway Administration.
|b Implementation Division.
|
| 810 |
1 |
|
|a United States.
|b Federal Highway Administration.
|t Report - Federal Highway Administration ;
|v FHWA-TS-78-216.
|
| 999 |
|
|
|a MARS
|
| 999 |
f |
f |
|s f9554fcb-a29a-30e0-9173-975410b4e94d
|i d32919be-5dbe-3451-896e-210166515744
|t 0
|
| 952 |
f |
f |
|p normal
|a Texas A&M University
|b College Station
|c Sterling C. Evans Library
|d Evans: US Documents (Annex 5th floor)
|t 0
|e TD 2.30/4: 78-216
|h Superintendent of Documents classification
|i unmediated -- volume
|m A14817796203
|
| 998 |
f |
f |
|a TD 2.30/4: 78-216
|t 0
|l Evans: US Documents (Annex 5th floor)
|