New tube bundle heat transfer correlations and flow regime maps for a Once Through Steam Generator /
| Main Author: | Blanchat, Thomas Kevin, 1955- |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1988.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Similar Items
Boron dilution of reactor coolant during steam generator decontamination.
Published: (1980)
Published: (1980)
Steam generator sludge deposition in recirculating and once through steam generator upper tube bundle and support plates : presented at the 1992 International Joint Power Generation Conference, Atlanta, Georgia, October 18-22, 1992 /
Published: (1992)
Published: (1992)
Steam Generator Tube Integrity Program/Steam Generator Group Project : final project summary report /
Published: (1990)
Published: (1990)
Steam Generator Tube Integrity Program/Steam Generator Group Project : final project summary report /
by: Kurtz, R. J.
Published: (1990)
by: Kurtz, R. J.
Published: (1990)
Authorizing the furnishing of steam heat from the Central Heating Plant to the National Academy of Sciences.
Published: (1940)
Published: (1940)
To authorize the furnishing of steam from the Central Heating Plant to the District of Columbia.
Published: (1936)
Published: (1936)
Steam generator tube ruptures at two PWR facilities.
Published: (1979)
Published: (1979)
Questionnaire on steam generator operating history.
Published: (1978)
Published: (1978)
Potential failure of steam generator tubes with kinetically welded sleeves.
Published: (1994)
Published: (1994)
Tube-to-tube contact resulting in wear in once-through steam generators.
Published: (2012)
Published: (2012)
Industrial boilers and heat recovery steam generators : design, applications, and calculations /
by: Ganapathy, V.
Published: (2003)
by: Ganapathy, V.
Published: (2003)
Preliminary assessment of PWR steam generator modelling in RELAP5/MOD3 /
by: Preece, R. J., et al.
Published: (1993)
by: Preece, R. J., et al.
Published: (1993)
Steam generator tube end cracking.
Published: (1998)
Published: (1998)
Results of steam generator tube examinations.
Published: (1996)
Published: (1996)
Industrial Boilers and Heat Recovery Steam Generators: Vol. 149: Design, Applications, and Calculations.
by: Ganapathy, V.
Published: (2002)
by: Ganapathy, V.
Published: (2002)
Application of automated analysis software to eddy current inspection data from steam generator tube bundle mock-up /
by: Bakhtiari, Sasan, et al.
Published: (2016)
by: Bakhtiari, Sasan, et al.
Published: (2016)
Strategy for assessment of WWER steam generator tube integrity : report prepared within the framework of the Coordinated Research Project on Verification of WWER Steam Generator Tube Integrity.
Published: (2007)
Published: (2007)
Voltage based repair criteria for Westinghouse steam generator tubes affected by outside diameter stress corrosion cracking.
Published: (1995)
Published: (1995)
Steam generator tube rupture analysis deficiency.
Published: (1988)
Published: (1988)
Steam generators /
by: Rudorff, Dagobert William
Published: (1938)
by: Rudorff, Dagobert William
Published: (1938)
Steam line break analysis using RELAP5/MOD3.3 for steam generator blowdown load assessment /
by: Jung, Han-Sik
Published: (2017)
by: Jung, Han-Sik
Published: (2017)
Operational experience on steam generator tube leaks and tube ruptures.
Published: (1994)
Published: (1994)
Ferritic steels for fast reactor steam generators.
Published: (1978)
Published: (1978)
Recent foreign and domestic esperience with degradation of steam generator tubes and internals.
Published: (2001)
Published: (2001)
Degradation in small-radius u-bend regions of steam generator tubes.
Published: (1997)
Published: (1997)
Gain-scheduled nonlinear control of u-tube steam generators at low powers /
by: Menon, Sunil Kumar, 1967-
Published: (1990)
by: Menon, Sunil Kumar, 1967-
Published: (1990)
Feedwater line break analysis using RELAP5/MOD3.3 for steam generator blowdown load assessment /
by: Jung, Han-Sik
Published: (2016)
by: Jung, Han-Sik
Published: (2016)
Cracking in the upper shell to transition cone girth weld of a steam generator at an operating pressurized water reactor.
Published: (1982)
Published: (1982)
Sensitivity studies of failure of steam generator tubes during main steam line break and other secondary side depressurization events /
Published: (2007)
Published: (2007)
Steam generators--enclosing summary of operating experience with recirculating steam generators, NUREG-0523.
Published: (1979)
Published: (1979)
Unanticipated crack in a particular heat of alloy 600 used for Westinghouse mechanical plugs for steam generator tubes.
Published: (1994)
Published: (1994)
Steam generator overfill.
Published: (1981)
Published: (1981)
Steam generator thermal hydraulics : presented at the 29th National Heat Transfer Conference, Atlanta, Georgia, August 8-11, 1993 /
Published: (1993)
Published: (1993)
Status of LMFBR reheat in Western Europe, 1972 : report of the United States of America LMFBR Sodium Reheat Team visit to France, Germany (FRG), Netherlands, and United Kingdom, May 22-June 6, 1972.
Published: (1973)
Published: (1973)
U.S. operating experience with thermally treated alloy 690 steam generator tubes /
by: Karwoski, K. J., et al.
Published: (2007)
by: Karwoski, K. J., et al.
Published: (2007)
U.S. operating experience with thermally treated alloy 600 steam generator tubes /
by: Karwoski, K. J.
Published: (2003)
by: Karwoski, K. J.
Published: (2003)
Operation with steam generator tubes seriously degraded.
Published: (1992)
Published: (1992)
The Generation and utilization of steam in industry : symposium /
Published: (1981)
Published: (1981)
Ferritic steels for fast reactor steam generators : proceedings of an international conference held by the British Nuclear Energy Society at the Institution of Civil Engineers, London, 30 May-2 June 1977 /
First Joint U.S./Japan LMFBR Steam Generator Seminar, February 1978, Japan.
Published: (1978)
Published: (1978)