Industrial scheduling /

Bibliographic Details
Main Author: Muth, John F.
Other Authors: Thompson, Gerald Luther, 1923-
Format: Book
Language:English
Published: Englewood Cliffs, N.J. : Prentice-Hall, [1963]
Series:Prentice-Hall international series in management.
Subjects:

MARC

Tag First Indicator Second Indicator Subfields
LEADER 00000cam a2200000 4500
001 in00000219613
005 20151009084042.0
008 720128 1963 eng u
010 |a  63012749  
035 |a (OCoLC)00230145 
035 |9 ABA0313AM 
040 |c WSU  |d OCL  |d TXA  |d UtOrBLW 
049 |a TXAM  |c [362544] 
082 0 |a 658.51 
090 |a HD69.P7  |b M8 
100 1 |a Muth, John F. 
245 1 0 |a Industrial scheduling /  |c edited by John F. Muth and Gerald L. Thompson, with the collaboration of Peter R. Winters. 
264 1 |a Englewood Cliffs, N.J. :  |b Prentice-Hall,  |c [1963] 
300 |a xviii, 387 pages :  |b diagrams ;  |c 24 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Prentice-Hall international series in management 
504 |a Bibliography: pages 380-387. 
650 0 |a Production control. 
700 1 |a Thompson, Gerald Luther,  |d 1923- 
830 0 |a Prentice-Hall international series in management. 
999 |a MARS 
999 f f |s 0b8b0b40-e6c4-3e45-8b30-f500b5344929  |i ceaa67bd-595d-3a8e-8fed-7b8dcb095884  |t 0 
952 f f |p ric  |a Texas A&M University  |b Rellis Campus  |c Joint Library Facility  |d Remote Storage  |t 0  |e HD69.P7 M8  |h Library of Congress classification  |i unmediated -- volume  |m A14802637698 
998 f f |a HD69.P7 M8  |t 0  |l Remote Storage