| Tag |
First Indicator |
Second Indicator |
Subfields |
| LEADER |
00000cam a2200000 a 4500 |
| 001 |
in00000010706 |
| 005 |
20151007051429.0 |
| 008 |
860911s1985 dcua b 00000 eng d |
| 035 |
|
|
|a (OCoLC)14206901
|
| 035 |
|
|
|9 AAA2933AM
|
| 040 |
|
|
|a PSE
|c PSE
|d m/c
|d TXA
|d UtOrBLW
|
| 049 |
|
|
|a TXAM
|c [A12577311]
|
| 050 |
|
4 |
|a HD9685.U52
|b L42 1985
|
| 245 |
0 |
0 |
|a Least-cost utility planning /
|c prepared ICF Incorporated.
|
| 264 |
|
1 |
|a Washington, D.C. :
|b Edison Electric Institute,
|c 1985.
|
| 300 |
|
|
|a 54 pages :
|b illustrations ;
|c 28 cm.
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a unmediated
|b n
|2 rdamedia
|
| 338 |
|
|
|a volume
|b nc
|2 rdacarrier
|
| 500 |
|
|
|a "04-85-23".
|
| 500 |
|
|
|a Cover title.
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 650 |
|
0 |
|a Electric utilities
|x Planning.
|
| 650 |
|
0 |
|a Electric utilities
|x Rates.
|
| 710 |
2 |
|
|a ICF Incorporated.
|
| 710 |
2 |
|
|a Edison Electric Institute.
|b Strategic Planning Group.
|
| 999 |
|
|
|a MARS
|
| 999 |
f |
f |
|s 91d76335-658c-3e38-9e53-6b38c058a9a9
|i 72e1f8a5-b208-3d96-a87d-63a463b58ee7
|t 0
|
| 952 |
f |
f |
|p ric
|a Texas A&M University
|b Rellis Campus
|c Joint Library Facility
|d Remote Storage
|t 0
|e HD9685.U52 L42 1985
|h Library of Congress classification
|i unmediated -- volume
|m A14812577311
|
| 998 |
f |
f |
|a HD9685.U52 L42 1985
|t 0
|l Remote Storage
|